THE MANDATORY PREBID MEETING FOR CONTRACT 11-288804 WILL BE ON WEDNESDAY, APRIL 15, 2009 AT THE FOLLOWING LOCATION: 4050 TAYLOR STREET, SAN DIEGO, CA 92110
THE MEETING WILL BE HELD LOCATED IN BUILDING 1, FLOOR 1, ROOM 134 (GALLEGOS CONFERENCE ROOM), FROM 9:00 A.M. - 12:00 P.M.
PLEASE CALL (619) 688-6635 WITH QUESTIONS.
| CONTRACT NO: | 11-288804 |
| ROUTE / KP | 11-SD-905-R9.5/R15.0 |
| LOCATION | In San Diego County In San Diego From 1.2 Km East Of Route 805/905 Separation To 0.8 Km East Of Britannia Overcrossing |
| DESCRIPTION | Construct New 6 Lane Pcc Freeway. |
| ESTIMATE | $ 81,300,000 |
| WORKING
DAYS |
990 (Including
250 Working Days Min. Type 2 Plant Establishment) |
| ADVERTISE DATE | 11/17/2008 |
| BID OPENING | 01/08/2009
02/05/2009 |
| FINAL POSTING |
04/30/09 @ 06:30 |
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| PREBID SIGN-IN SHEET 04/15/09 |
|
|
|
|
ORDERING
PROJECT PLANS AND SPECIFICATIONS
ADDENDUM
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1 Q:11/18/08 |
Plan Sheet / Specification
Reference= Special Provisions Section 5-1.06 Supplemental Project
Information page no. 26 Question= Special Provisions
Section 5-1.06 Supplemental Project Information page no. 26, states
that cross sections are available on this project. When will the
electronic cross sections be available to download for our use?
|
|
2 Q:11/20/08 |
Plan Sheet / Specification
Reference= Items 108-112 Reinforced Concrete Cribwall C7- Page 128 of
the Special Provisions 10-1.41 Question=The Specifications
call out for the Crib members to colered- Davis "Sandstone"
|
|
3 Q:11/24/08 |
Plan Sheet / Specification
Reference=Items 108-112 Cribwall. 10-1.41 page 128 Question= Typically with
vertical cribwalls front face panels are required to keep soil from
spilling. Cribwall Standard Specifications sheet C7e General Notes 9
states."Use of "Front Face Closure Member" shall be required only when
specified on project plans or in the Special Provisions."
|
|
4 Q:11/26/08 |
Plan Sheet / Specification
Reference= Question= We downloaded the
cross-sections and for the E5 line the sections begin at station 140+00
rather than the beginning of construction at 120+00. Please
clarify.
|
|
5 Q:12/02/08 |
Plan Sheet / Specification
Reference= Special Provisions Section Titled "Amendments to the
Standard Specificatons"stops on page 424 and appears to be missing
several important changes. Question= Will you be
forwarding the missing pages in a future amendment?
|
|
6 R:12/02/08 R:03/30/09 |
Plan Sheet / Specification
Reference= Question= Last week we had
Mesa Repo download and print the cross-sections. As I mentioned in a
prior post missing sheets for the E5 line were discovered. Since
then you have updated the sections (12/2/2008). What changes have
been made, so we only have to print those rather than a complete set?
|
|
7 R:12/22/08 |
Plan Sheet / Specification
Reference= Question= Post layout sheet
from station 163+80 to 167+00
|
|
8 R:12/22/08 |
Plan Sheet / Specification
Reference= Plan Sheet L-16 Question= Plan Sheet L-16 is
missing from the issued plans. When will it be available to download
for our use?
|
|
9 R:12/23/08 |
Plan Sheet / Specification
Reference= Question= Please refer to
Addendum No. 1 on Contract 11-091824 and specifically to the Section
5-1.31 Load Limitations.
|
|
10 R:12/22/08 |
Plan Sheet / Specification
Reference= Item #212 Chain link Fence (Type CL-1.8);Special Provision
Section 10-1.99 makes reference to provisions of section 80 and to the
use of 25mm mesh fencing,but does not reference vinyl coated fabric.
Item# 211 Wildlife Fence references the vinyl coated fabric but does
not refer to the mesh size. Question= Should Item #212 be
considered to be galvanized fabric and not vinyl coated? and should
Item #211 be 25mm mesh fafric or the standard 2" mesh?
|
|
11 R:12/11/08 |
Plan Sheet / Specification
Reference= Please refer to Item 5 in Stage 3 page 442 of the plans Question= The fill material
for the abutments to the Heritage U.C. needs to come from excavation
west of the embankment at sta 146.
|
|
12 R:12/22/08 |
Plan Sheet / Specification
Reference= We are missing plan sheet L-16 Question= Can you please
provide this plan sheet?
|
|
13 R:12/10/08 |
Plan Sheet / Specification
Reference= 108-112 Question= In the special
provisions for the Geosynthetic Reinforced Embankment- 10-1.41,
Reinforced Concrete Crib Members under "Reinforcing Steel" the spec
says to conform to ASTM Designation: A615, Grade 60 or A 706.
|
|
14 R:12/10/08 R:03/30/09 |
Plan Sheet / Specification
Reference= Question= Are there Cross Section for the Earthwork Available?
Is there a geo-technical
report available?
|
|
15 R:12/18/08 |
Plan Sheet / Specification
Reference= Plan Sheets: U-4, U-20 Question= At what stage will
the gas/telephone contractors relocate their utility on Airway Rd?
The
gas line could be placed in the same trench as the sanitary sewer.
|
|
16 R:01/21/09 |
Plan Sheet / Specification
Reference= Plan Sheet U-11 Question= Note 3 states, see
"utility details plan sheet UD-31A. Where is this plan sheet? Thank you.
|
|
17 R:12/15/08 |
Plan Sheet / Specification
Reference= Bid Items 108-112 Concrete Cribwall Question= There is a
discrepancy between the 2006 Metric and Standard (English) Plan C7E.
|
|
18 R:01/12/09 |
Plan Sheet / Specification
Reference= Bid Item 62 Ditch Excavation Question= In the Drainage
Quantities for segment B, Ditch Excavation is only quantified for
drainage system B5 on sheet 380 and B12 on sheet 388 for a total of 14
m3, yet the total quantity for segment B on sheet 390 is 77.7 m3.
|
|
19 R:12/24/08 |
Plan Sheet / Specification
Reference= Question= Due to holidays, can
the bid be postponed?
|
|
20 R:12/19/08 |
Plan Sheet / Specification
Reference= Item 87, Concrete Pavement, X-20, X-22, X-25 Question= Do the concrete bus
pads and the exit ramp termini referenced on the cross sections get
paid under the Concrete Pavement Item?
|
|
21 R:12/22/08 |
Plan Sheet / Specification
Reference= Item #81 and #83 Question= Could you please
provide the asphalt/base structural section for the new portion of the
park and ride lot?
|
|
22 R:01/28/09 |
Plan Sheet / Specification
Reference= General Conditions Question=Caltrans has been
directed to not award any new work until the budget crisis is resolved.
Per direction from Caltrans we (contractors)are being asked to submit
bids for work that may not be awarded in the near future. We request
that Caltrans postpone this bid so that the low bidder will not be
required to extend there bid for an unknown period of time.
|
|
23 R:12/23/08 |
Plan Sheet / Specification
Reference= Question= We are trying to
figure out what you mean by your response to questions #7, 8 and 12.
|
|
24 R:01/12/09 R:03/04/09 |
Plan Sheet / Specification
Reference= Bid item #47, plan sheet L-14 and Q-32, regarding the
concrete removal. Question= There are no details
describing the extent of the concrete removals in this area.
|
|
25 R:01/12/09 |
Plan Sheet / Specification
Reference= Question= Bid Item No. 64,
Item Code 015343: Geosynthetic Reinforced Embankment:
|
|
26 R:01/21/09 |
Plan Sheet / Specification
Reference= Plan Sheet UD-1, General Note 2, "all
non-circumferentially...must be bonded per sheet UD-10. This plan sheet
is not part of the plans. Question= When will you submit
this sheet to the planholders?
|
|
27 R:01/12/09 |
Plan Sheet / Specification
Reference= Bid Item 42 - Remove Waterline Question= Plan Sheet U-27
depicts the "Waterline Removal Table", referencing line #9 as removing
296 meters. The plan view shows line #9 pointing at two waterlines,
totalling 592 meters of removal. What is the correct quantity?
|
|
28 R:01/12/09 |
Plan Sheet / Specification
Reference= Item No.11 Item Code 074038 Temporary Drainage Inlet
Protection. Plan Sheets 179-185 Question= On the temporary
Water Pollution Control Quantities for Segment "A", "B", and "C" the
total number for Temporary Drainage Inlet Protection is 140 Inlets. The
Legend in the Plans do not specify what type of protection is to be
used. On the Temporary Water Pollution Control Details WPCD-1, WPCD-2,
WPCD-3 shows Temporary Drainage Inlet Protection (TYPE 3A), (TYPE 3B),
(TYPE 4A), (TYPE 4B), and (TYPE 5). How many of each type are there?
|
|
29 R:01/20/09 |
Plan Sheet / Specification
Reference= Question= The current budget
status as well as direction from the state controller is that funding
is not available for this project. There has been discussion of
changing the bid date to tentative until funding issues are
clarified. Is this the Department's intention, and if so, when do
plan on posting.
|
|
30 R:01/27/09 |
Plan Sheet / Specification
Reference= Question= 11-288804 - can you
please push back the bid date...at least two weeks?
|
|
31 R:02/03/09 |
Plan Sheet / Specification
Reference= Item Numbers 7 (TEMPORARY CONCRETE WASHOUT FACILITY) Special
Provision Section 10-1.09. Item Number 9 (TEMPORARY CHECK DAM) Special
Provision 10-1.11. Item Number 11 (TEMPORARY DRAINAGE INLET PROTECTION)
Special Provision 10-1.16 . Item Number 70 (Drainage Inlet Protection )
Special Provision 10-1.50. Item 71 (CHECK DAM) Special Provision
10-1.49. Question= Gravel-Filled Bags
require a nonwoven polypropylene geotextile or polymer material that
shall conform to the listed specification requirements. What company
manufactures a bag that meets these specifications? Is there a supplier
Caltrans uses or recommends?
|
|
32 R:02/05/09 |
Plan
Sheet / Specification
Reference= Bid Item #160,#161,#162 -
Welded Steel Pipe Casing Question= Please confirm that
linings & coatings for those bid items are per page 340 of your
specifications: "pipe casing shall be lined and coated with hot applied
coal tar enamel per AWWA C203, Type II. Coating and lining thickness
shall be 2.3 mm minimum in the interior. Coating shall be 18.8 mm
cement mortar coated on the exterior."
|
|
33 R:02/05/09 |
Plan
Sheet / Specification Reference= Bid items #160,#161¢
Welded Steel Pipe Casing Question= We are asking to
allow spiral welded pipe for casing for bid items #160,#161¢
|
|
34 R:02/05/09 |
Plan Sheet / Specification
Reference= Bid items #162 Welded Steel Pipe Casing, dwg SS-4
|
|
35 R:02/05/09 |
Plan
Sheet / Specification Reference= Bid items #160,#161,#162
Welded Steel Pipe Casing, dwg SS-4 & SS-3 Question= Do you want lap welded joints or butt welded joints for the sewer casing shown on dwgs SS-3 & SS-4 ?
|
|
36 R:04/16/09 |
Plan Sheet / Specification
Reference= Estimated Quantity for Bid items
#160 & #161 Welded Steel Pipe Casing, Bid Item List &
Dwg.SSQ-1
|
|
37 R:04/15/09 |
Plan
Sheet / Specification
Reference= Bid Item #164 - 300 mm
water line Bid Item # 165 - 400 mm water line Bid Item # 166 - 600 mm water line Question= What is the design pressure ?
|
|
38 R:02/05/09 |
Plan
Sheet / Specification
Reference= Dwgs: U-24, U-25 & U-27; Bid Item #164, # 165
& # 166B Question= What kind of joints do you want for the water line piping ?
|
|
39 R:02/05/09 |
Plan
Sheet / Specification
Reference= Bid Item #160,#161,#162 - Welded Steel Pipe Casing Question= Do you want pressure grout couplings for casing?
|
|
40 R:02/05/09 |
Plan
Sheet / Specification
Reference=Dwgs: U-24, U-25 & U-27; Bid Item #164, # 165 &
# 166 Question= Please review and advise the desired thickness for cement mortar lining.
|
|
41 R:02/05/09 |
Plan
Sheet / Specification
Reference= Dwgs: U-24, U-25 & U-27; Bid Item #164, # 165
& # 166 Question= Please confirm that the coating required for the water lines is Tape coating and Rock shield as specified on page 340
|
|
42 R:04/16/09 |
Plan
Sheet / Specification Reference= Water Pipeline: Dwg U-25 & U-24 Question= On Dwg U-25 plan view the water line is called out as 600 mm CMLCS Water and on the legend is shown CML&TC=Cement Mortar Lined and Tape Coated Pipe What CMLCS means? Which is correct: CMLCS or CML&TC Same question on Dwg U-24 plan view.
|
|
43 R:04/16/09 |
Plan
Sheet / Specification Reference= Dwg UD-6 Question= What kind of coating is required for the pipe on the bridge ? Dwg UD-6 calls our 300 mm CMLCS. What CMLCS stands for? It is Northwest Pipe Co's interpretation that it should be CML&TC as shown on Dwg. UD-7. Please advise.
|
|
44 R:02/05/09 |
Plan
Sheet / Specification
Reference= Water pipeline relocation; Dwg U-24,U-25, U-27 Question= Please provide detail dwgs. for blow off and airvac piping.
|
|
45 R:02/03/09 |
Plan Sheet / Specification
Reference= Bid items #89, #91, #93-Furnish Steel Piling
|
| 46 Q:02/11/09 R:02/23/09 |
Plan
Sheet / Specification
Reference= Item No. 49 Clear & Grubb Question= A site visit shows a tremendous amount of trash/rubbish that is impractical to accurately quantify. How will Caltrans pay for removal and disposal of such? The fair way to pay for this work would be on extra work.
|
| 47 Q:02/11/09 R:02/23/09 |
Plan
Sheet / Specification
Reference= Item No. 51 Roadway Exc Question= Refer to sheet C-23 table specifing the Expansive Soil Locations and sheets X-1 through X-28. What is the purpose of placing Selected Material in locations not specified in Expansive Soil Locations Table? Also, on sheets X-1 through X-28 please explain the intent of the call out
|
| 48 Q:02/11/09 R:02/23/09 |
Plan
Sheet / Specification
Reference= Item No. 51 Roadway Exc Question= So that there is a level bidding field, can this contract provide for the disposal of material in locations specified in addendum 1 by hauling through contract 11-091824?
|
| 49 Q:02/11/09 R:02/23/09 |
Plan
Sheet / Specification
Reference= Item No. 51 Roadway Exc Question= Regarding construction of Airway Road East, please refer to sheets G-21 through G-23. With the excpetion of sheet SC-33 which calls out "Provide Access to Residents At All Times" there are no other staging plans. There doesn't appear to be residents on this portion of Airway, can this road be closed?
|
| 50 Q:02/17/09 R:02/25/09 |
Plan
Sheet / Specification
Reference= Type of joints for the water line pipe (Bid Item #164, #165
& #166) Question = Your plan drawings (see U-24, U-25 & U-27) do not call out what type of joints should be used. Your contract documents (page 337) says: “Pipe ends shall be as follow: A. Bell & spigot B. Lap Welded Joints C. Flanges D. Butt Straps E. Grooved end couplings F. Flexible pipe couplings Which one on the above do you want ? On a previous identical question your answer was: This is specified in the contract document. Please bid accordingly We could not find anywhere in the contract documents where is required a certain type of joints for these bid items so please direct us to the page or drawing number where this info is listed.
|
| 51 Q:02/17/09 R:02/25/09 |
Plan
Sheet / Specification
Reference= Handholds for the water pipe: Size and number (Bid Item
#164, #165 & #166) Question= Your contract documents page 338 ask for: ”handholes shall be provided at each joint to apply mortar to line the inside joint” This is the only reference to the handhole we found in the contract documents or plan drawings. Please specify the size of the handhole and how many do you want per joint
|
| 52 Q:02/17/09 R:02/25/09 |
Plan
Sheet / Specification
Reference= Applied coal tar epoxy overcoat , over the cement mortar
coating which is over the tape for Bid Item #164, # 165 & #
166 (Dwgs: U-24, U-25 & U-27) Question= Do you want the coating to be tape wrap with rock shield over and coal tar over the rock shield ? Please clarify if applied coal tar epoxy overcoat is required for the above mentioned bid items The plans call for Tape Coating and Rock shield outlined on page 340. Your specifications 10-4.03, pg 338 requires all cement mortar coated pipelines shall be provided with a shop applied coal tar epoxy. Do you want the coating to be tape wrap with rock shield over and coal tar over the rock shield ?
|
|
53 Q:02/20/09 |
Plan Sheet / Specification
Reference= Items 160, 161 & 162 Question= #160 The 1850mm
(72”) casing has a carrier pipe of 15” or 400mm, isn’t that a rather
large casing for that purpose? Large and expensive to concrete encase. Suggest 36” (900mm) casing for 15” (400mm) carrier, 60” (1500mm)casing for 42” (1050mm) carrier and 42” (1050mm) casing for 24” (600mm)casing
|
|
54 Q:02/25/09 |
Plan Sheet / Specification
Reference= Item 64, Geosynthetic Reinforced Emb. Sheet 617 Concrete
membe quantities Question= Can you verify
"cribwall" (concrete headers and stretchers) quantities for the
geosynthetic reinforced embankment?
|
|
55 Q:02/26/09 R:04/22/09 |
Plan Sheet / Specification Reference= SS-3 Question= Is the 1850 mm
steel casing concrete encased? The plans call out for concrete
encasement on the VCP only. Note 1 states to refer to Detail OM-2,
which shows a detail of Manhole #3. Please clarify. Thank you.
|
|
56 Q:02/26/09 |
Plan Sheet / Specification
Reference= ITEM #11, TEMPORARY DRAINAGE INLET PROTECTION (140 INLETS),
W.P.C. CONTRACT PLAN SHEETS 138-185 SPECIAL PROVISION SECTION 10-1.6 Question= What is the total quantity of each TEMPORARY DRAINAGE INLET PROTECTION Type? (The quantity of each Inlet Type is NOT given in the Plans, Quantities, or the Special Provision Section 10-1.6). Please respond with the quantity of each type. (TYPE 3A) QUANTITY? (TYPE 3B) QUANTITY? (TYPE 4A) QUANTITY? (TYPE 4B) QUANTITY? (TYPE 5) QUANTITY?
|
|
57 R:03/04/09 |
Plan Sheet / Specification
Reference= Special Provision Section 10-1.02 Order of Work Question= Is the table showing
right of way parcel access valid and are the dates still current as
shown? Can the actual limts or boundaries of the parcels
described in the table be provided in plan format? Since the
right of way is acquired or being acquired we need to see the limits or
actual boundaries of the parcels affected and we respectfully request
confirmatation on exactly where we have access and when. Do you
anticipate that the contractor may have access to the entire project
ROW by the time the project actually bids?
|
|
58
Q:03/05/09 R:03/16/09 |
Plan Sheet / Specification
Reference= Question
= In reference to questions 25 and 54 and per your answer “bid per
contract documents”. The quantity chart on page 617 of 857 gives a non
pay quantity of 1370 ea headers and stretchers; actual quantity needed
per contract drawings is 4050 ea. How will the additional headers and
stretchers required be paid for. Please clarify.
|
|
59
Q:03/05/09 R:03/16/09 |
Plan Sheet / Specification
Reference= 80 Class 4 Aggregate Subbase, Section 10-1.55 page 151 Question = There is no information given for the Gradation or Quality, please provide.
|
|
60
Q:03/12/09 R:04/16/09 |
Plan Sheet / Specification
Reference= N/A Question
= We have been informed that all advertised contracts pending bid
opening that are funded by Prop. 1B will be postponed for 8-9 months.
Please confirm.
|
|
61
|
Plan Sheet / Specification
Reference= Addendum #9, Section 5-1.015 PERFORMANCE OF UDBEs,
last sentence. Question: The last sentence states that
“The Department does not pay for work or material unless it is
performed or supplied by the listed UDBE.”
|
| 62 Q:04/22/09 R:04/22/09 |
Plan Sheet / Specification
Reference= Sewer Encasement, Sheet #SS-3
|
| 63 Q:04/22/09 R:04/22/09 |
Plan Sheet / Specification Reference= Question
= I attended the mandatory prebid
meeting and you were supposed to publish the list with the general
contractors who attended the meeting.
|