| CONTRACT NO: | 11-281504 |
| ROUTE / KP | 11-SD-5703 |
| LOCATION | In San Diego County At Boulevard At Boulevard Maintenance Station At 40945 Old Highway 80 |
| DESCRIPTION | Install
Soil Vapor Extraction And Air Sparging System For Remediation. |
| ESTIMATE | $510,000 |
| WORKING
DAYS |
90 |
| ADVERTISE DATE | 05/04/2009 |
| BID OPENING | 05/29/2009 |
| FINAL POSTING |
05/28/09
@ 15:35
|
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| Information
Handout Materials Information |
|
|
|
|
ORDERING
PROJECT PLANS AND SPECIFICATIONS
ADDENDUM
|
|
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1 Q:05/12/09 |
Plan Sheet / Specification
Reference=Special Notices Question= Is there and/or will
there be a pre-bid site visit conducted. If so please give date and
time.
|
|
2 Q:05/14/09 |
Plan Sheet / Specification
Reference= General specifications Question= 1) Is there a time line of the
contracted work and post related system work?
2) Is the contract 90 days for
installation and testing or 12 months for installation, testing, and
O&M?
3) What is the period to be
used for costing for the rental of VES/AS equipment?
4) What is the lease period
and is there a lease with an option to purchase?
5) What is the line item for
the crash cushion system equipment?
6) What is the line item for
the concrete foundation pad for the VES and AS?
7) What is the line item for
the equipment compound foundation and equipment and piping
installation?
|
| 3 Q:05/18/09 R:05/18/09 |
Plan Sheet / Specification
Reference= General specifications Question= The VES equipment on the bid item list is a lump sum line item although the equipment in the specifications is based on a rental or lease per moth or over the specified project period. Please advise on which costing approach is required for this proposal and if rental/lease are required how do we price the line item?
|
| 4 Q:05/22/09 R:05/22/09 |
Plan Sheet / Specification
Reference=1. Regarding sheet C-2 LPG system. Question=Can the propane tank be leased?
|
| 5 Q:05/26/09 R:XX/XX/XX |
Plan Sheet / Specification
Reference=Item#26 Bollard: Sheet#7 Construction detail C-5 Bollard
Detail. Special Provision Section 10-1.14 Bollards page 30 and 31 Question=Special Provision Section 10-1.14 Bollards states that Bollards shall be of cast iron conforming to the provisions for gray iron castings in Section 55 "Steel Structures" of the Standard Specifications and these provisions, However the Construction Detail C-5 Bollard Detail calls for a 6'x8' Dia Schedule 40 Steel Bollard which of these should we base our bid on?
|
| 6 Q:05/26/09 R:XX/XX/XX |
Plan
Sheet / Specification
Reference= Item#11, Air Compressor, C-6, 10-5.06 Question= Kaeser does not offer an oil-less unit for this application, so is there a specific unit considered in the bid?
|
OTHER LINKS OF INTEREST
DISTRICT 11 CONSTRUCTION
BIDDER'S INQUIRIES & RESPONSES
DISTRICT 11 HOMEPAGE
CALTRANS OFFICE ENGINEER:
Contract Advertisement, Special Provisions, Plan Holders, Contract
Awards, etc.