| CONTRACT NO: | 11-243204 |
| ROUTE / KP | 11-SD-8-R49.0 |
| LOCATION | In San Diego County Near Pine Valley At Buckman Springs Rest Area |
| DESCRIPTION | Safety Roadside Rest Area Restoration/ada Compliance. |
| ESTIMATE | $2,780,000 |
| WORKING DAYS |
450 days |
| ADVERTISE DATE | 10/26/2009 |
| BID OPENING | 12/03/2009 |
| FINAL POSTING |
12/02/2009
@ 12:50 PM
|
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| INFORMATION HANDOUT | BID ITEMS |
SPECIAL PROVISIONS | PLANS | PLANHOLDERS' LIST |
|
| |
ORDERING
PROJECT PLANS AND SPECIFICATIONS
ADDENDUM
|
|
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:10/27/09 |
Plan Sheet / Specification
Reference= Question= Will there be a bid
walk. If so when?
|
|
2 R:11/05/2009 |
Plan Sheet / Specification Reference= 30% Self-Performance Question= This contract is for a new rest area building and site improvements. The building portion of the work will require numerous specialty subcontractors. The breakdown of work does not lend itself to self-perform 30% of the work. We request that this requirement be waived or reduced to 15% for the project.
|
| 3 R:11/16/09 |
Plan Sheet / Specification
Reference= Question=
2) Not sure where the crash cushion are to go. Please confirm.
3) Is water and electrical provided to us?
4) Are the Caltrans project funding signs required and were?
|
|
4 R:11/19/2009 |
Plan Sheet / Specification Reference= Section 2-1.03 of the Standard Specifications "Examination of Plans, Specifications, Contract, and Site of Work. Question= Is the site fenced?
Can prospective bidders visit the site at any time?
|
|
5
R:11/19/09 |
Plan Sheet / Specification Reference= Plan Sheet # 144, 145 Question= There is no bid item
for the new site electrical and lighting. Is all electrical and
lighting for the entire project to be paid in the lump sum bid item #
33, "Building Work"?
|
|
6
R:11/19/09 |
Plan Sheet / Specification Reference= Plan Sheet # 57 Question=There is no bid item
for the demolition or abatement of the existing comfort station. Is
this work to be included in Item # 12, "Clearing and Grubbing" or in
Item # 33, "Building Work"?
|
|
7
R:11/19/09 |
Plan Sheet / Specification Reference= Bid Schedule Question=Where is the bid item
for the site electrical?
|
|
8
R:11/24/09 |
Plan Sheet / Specification Reference= Item# 33 Question= Will the Aerially
Deposited Lead Survey be posted online.
|
|
9
R:12/01/09 |
Plan Sheet / Specification
Reference= 26 (IP-1) and 27 (IP-2). Question= Pages 26 and 27
indicate 1" lateral lines connecting to several bubblers. These
pages also indicate 1" lateral lines ending abruptly without any
bubblers attached to them. Should there be bubblers attached to
the 1" lateral lines, which do not connect to bubblers? If not,
where do they go?
|
|
10
R:12/01/09 |
Plan Sheet / Specification
Reference= Plan sheets EE0-6, EE0-9, EE1-2, Question= What is the
manufacturer and part number for the lighting
|
OTHER LINKS OF INTEREST
DISTRICT 11 CONSTRUCTION
BIDDER'S INQUIRIES & RESPONSES
DISTRICT 11 HOMEPAGE
CALTRANS OFFICE ENGINEER:
Contract Advertisement, Special Provisions, Plan Holders, Contract
Awards, etc.
DEPARTMENT OF TRANSPORTATION