| CONTRACT NO: | 11-081644 |
| ROUTE / KP | 11-SD-54,805-1.6/2.5,7.6/9.2 |
| LOCATION | In
San Diego County In Chula Vista And National City On Route 805 From 0.3
Mile North Of H Street Overcrossing To 0.2 Mile North Of Route 805/54
Separation And On Route 54 From 0.1 Mile West Of To 0.5 Mile East Of
Route 805/54 Separation |
| DESCRIPTION | Construct Southbound Lanes And Rehabilitate Ramps. |
| ESTIMATE | $9,700,000 |
| WORKING
DAYS |
220 |
| ADVERTISE DATE | 05/04/2009 |
| BID OPENING | 06/25/2009 |
| FINAL POSTING |
06/24/09 @ 15:10
|
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| INFORMATION
HANDOUT MATERIALS INFO |
|
|
|
|
ORDERING
PROJECT PLANS AND SPECIFICATIONS
ADDENDA
| ADDENDUM
1 ISSUED 06/19/09 |
ADDENDUM
2
ISSUED 06/22/09 |
|
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1 Q:05/07/09 |
Plan Sheet / Specification
Reference= Spec Provision Section 5-1.08 Payments Question= The spec's don't
provide max payments for Clearing, Schedule, etc.
|
|
2 Q:05/08/09 |
Plan Sheet / Specification
Reference= Special Provision Section 5-1.09 Supplemental Project
Information page no. 17 Question= Special Provision
Section 5-1.09 Supplemental Project Information page no. 17 states that
Cross Sections are available for inspection at the District Office.
|
|
3 Q:05/08/09 |
Plan Sheet / Specification
Reference= Page 110-119 Retaining Wall Plans
|
|
4 Q:05/11/09R:06/18/09 R:06/23/09 |
Plan Sheet / Specification
Reference= bid item # 84, 86 Question= Can you please
re-check your quantities for items 84 and 86?
|
|
5 Q:05/20/09R:05/21/09 |
Plan Sheet / Specification
Reference= sheet 185 and 186 of the project
|
|
6 Q:06/05/09R:06/19/09 |
Plan Sheet / Specification Reference= Plan sheet #182, note #3 Remove exist Barrier (Type 9). Plan sheet #201 Plan View showing slope paving removal.
On Plan Sheet #201, it shows removal of slope paving on what looks like the south abutment only. Will there be the need for slope paving to be removed on the north abutment also? And what are the dimensions for both locations?
|
|
7 Q:06/09/09R:06/10/09 |
Plan Sheet / Specification Reference= The special provisions, page 108, subsection entitled "REMOVE YELLOW PAINTED TRAFFIC STRIPE" in the next to last paragraph states that "One Lead Compliance Plan shall be prepared that addresses exposure to lead from traffic stripe and from material containing aerially deposited lead.
|
|
8 Q:06/10/09R:06/10/09 |
Plan
Sheet / Specification Reference= Bid Item 68 - DATA CORE, Special provision section 10-1.43 Question= Are cores required in the following areas? HMA placed in areas to receive Concrete Pavement or Rapid Strength Conc Pavement?
HMA placed as 0.15' overlay after 0.15' cold milling?
HMA placed in shoulders (not traveled way)?
"Take 4-inch or 6-inch diameter data cores: 1. At the beginning, end, and every 1/2 mile within the paving limits of each route on the project 2. After all paving is complete 3. From the center of the specified lane On a 2-lane roadway, take data cores from either lane. On a 4-lane roadway, take data cores from each direction in the outermost lane. On a roadway with more than 4 lanes, take data cores from the median lane and the outermost lane in each direction." Shoulders cores are not required. |
|
9 R:06/19/09 |
Plan
Sheet / Specification Reference= plan sheet 181 Question= the profie grades calls out an elevation and grade. There is a conflict between this information and the elevation at the BB shown in the plan view. Which one is correct?
|
|
10 Q:06/10/09R:06/19/09 |
Plan
Sheet / Specification Reference= Special provisions page 87 Traffic Chart No. 1 - Plan sheet 64 Question= Chart requires 3 lanes open. Referencing the plan sheet we could close lanes 5 and 4 and keep lanes 1, 2 and 3 open. Please confirm.
|
|
R:06/22/09 |
Plan Sheet / Specification
Reference= Specification pages 84 and 85
|
|
R:06/19/09 |
Plan Sheet / Specification
Reference= Traffic Charts for 805 and Bonita Road
|
| 13 Q:06/18/09 R:06/24/09 |
Plan
Sheet / Specification Reference= Item 42, Jacking Super
Structure, Plan Sheet No. 200 Question= Designated jacking locations at girders A and C at bents 2 and 3 are shown at mid-depth of superstructure, which is middle of sloping girder. How can jacks be placed at sloping girders? Are jacking recesses allowed in columns? If yes, where can they be located? Are Estimated jacking loads shown in table correct?
|
| 14 Q:06/19/09 R:06/XX/09 |
Plan
Sheet / Specification Reference= Reference is made to question
#12, Q @ 6/10/09, A @ 6/18/09. The posted answer to the question does not adequately address the situation. It is not possible to drive piling at night in conformance with the sound control requirements. It is not possible to drive piling in the daytime in conformance with the traffic charts and lane closure restrictions. Question= What can you change to make the planned construction possible: A, the traffic charts; B, the sound control requirements; C, the pile foundation design?
|
| 15 Q:06/19/09 R:06/24/09 |
Plan
Sheet / Specification Reference= ADDENDUM NO 1 Question= THE REVISED TRAFFIC CHARTS REQUIRE FALSEWORK OPENINGS LARGER THAN SHOWN ON SHEET 63 FOR STAGE 1B. WILL THE TRAFFIC CHARTS BE REVISED TO REFLECT THE TRAFFIC OPENINGS AS SHOWN IN STAGE 1B?
|
| 16 Q:06/19/09 R:06/22/09 |
Plan Sheet / Specification Reference=
|
| 17 Q:06/23/09 R:XX/XX/XX |
Plan Sheet / Specification Reference=Specials page #109 Bridge Removal and Structure Plans - Bridge removal portion.
|
OTHER LINKS OF INTEREST
DISTRICT 11 CONSTRUCTION
BIDDER'S INQUIRIES & RESPONSES
DISTRICT 11 HOMEPAGE
CALTRANS OFFICE ENGINEER:
Contract Advertisement, Special Provisions, Plan Holders, Contract
Awards, etc.
DEPARTMENT OF TRANSPORTATION