| CONTRACT NO: | 11-2T0934 |
| ROUTE / KP | 11-SD-15-M25.7/M31.0 |
| LOCATION | In San Diego County In San Diego From Mira Mesa Boulevard Undercrossing To 0.3 Kilometers South Of Route 56/15 Separation Overcrossing. |
| DESCRIPTION | To Construct Managed Lanes South Segment |
| ESTIMATE | $ 73,100,000 |
| WORKING
DAYS |
720 |
| ADVERTISE DATE | 10/29/2007 |
| BID OPENING | 01/10/2008 |
| FINAL
POSTING |
01/09/2008
@ 15:50 |
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| CROSS SECTIONS |
|
|
|
|
| CROSS
SECTIONS Last Updated 11/28/07 |
|
Posted 12/20/07 |
|
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:11/07/07 |
Plan Sheet / Specification
Reference= Special Provisions Section 5-1.15 Project Information
Question= Special Provisions
Section 5-1.15 Project Information page 156, states that cross sections
are available in electronic copy. When will the cross sections be
available and in what format?
MESA REPROGRAPHICS 5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to plot@mesareprographics.com San Diego, CA 92123
|
|
2
Q:11/20/07 |
Plan Sheet / Specification
Reference=
Question= Section 3-1.01A
refers to “Pre-Award Qualification Questionnaire” to be submitted by
the apparent low bidder. Such form is not found within the bid package.
Will such form be submitted after the bid?
|
|
3
Q:11/20/07 |
Plan Sheet / Specification
Reference=
Question= Section 2-1.03A
refers to « Small Business Preference ». Section 3-1.01B
“Award” does not specify the $ amount nor the percentage.
|
| Update 11/28/07 |
|
|
4
Q:12/06/07 |
Plan Sheet / Specification
Reference= Sheet 729 of 839, Pile Data Table
Question= The pile data table
on sheet 729 for the CIDH piles of the new Poway Rd. OC shows a
significant difference on 4 of the piles between the "Design Tip
Elevation" and the "Specified Tip Elevation". Please
clarify which tip elevation is to be used for this bid item.
|
|
5
Q:12/18/07 |
Plan Sheet / Specification
Reference= Section 5-1.14 Payments of the Special Provisions
Question= Article B sets a
linit of payment for Developing Water Item Code 170101 but there is no
Bid Item for this.
|
|
6
Q:12/19/07 |
Plan Sheet / Specification
Reference=
Question= On Sheet Nos. 791
& 792 of the project plans, the plans show's "SH's" of 3.965M
(10'-0") & 4.575M (12') which are divided equally to (15) &
(18) courses of .203M (8") CMU. The "SH" is shown being measured from
the bottom of the 736A barrier to the top of the 10"x4"x12 masonry cap.
The problem is that the "SH" needs to be adjusted for these two heights
either .101M (4") lower or higher. Otherwise an 8"x4"x16" will have to
be added to the all to make up the difference in height. No information
about a 8"x4"x16" is shown on the plans or whether Caltrans wants it
placed at the the bottom or top of the wall. Does the Caltrans want to
proceed with the use of an 8"x4"x16" unit? Or do they want full height
.203M (8") units throughout the wall, except for the cap block? Also, on Sheet No. 808 of the
project plans, the "SOUNDWALL REINFORCEMENT TABLE", shows to use high
stress CMU for "H"s over 4.369M. Does this mean the entire CMU wall,
over 4.369M, is to be high stressed block? Or only a few courses of
CMU. Please advise.
|
|
7
Q:12/19/07 |
Plan Sheet / Specification
Reference= 116 Structural Concrete, Retaining Wall, Plan Sheet 480
Question= Per plan sheet 480 of the construction drawings there are two types of Retaining Walls required for RW 304L, Type1 and Type1 Mod. The Type 1 Mod requires Revised Standard Plans for B3-1, B0-3 and B3-8. There are no revisions for these sections within the plan set and/or on the CalTrans web site under the July 2004 Standard Plans. Please clarify which details are to be used for RW 304L, Type 1 Mod and where these revisions can be obtained.
|
|
8
Q:12/19/07 |
Plan Sheet / Specification
Reference= Plan sheets 655-658
Question= Is it possible for
the District to reissue these plan sheets (655-658) so that the details
(bridge, retaining wall, concrete slab) are visible?
|
|
9
Q:12/19/07 |
Plan Sheet / Specification
Reference= Plan sheets 809 & 810
Question= On Sheets Nos. 809
& 810, the project plans show the aesthetic detail for masonry
sound wall. Are all block, except the 254x101x406 precision cap block,
split-one side or split-two side, does this include the pilaster as
well? In order to provide a
competive bid for the project we need this problem resolved.
|
|
10
Q:12/19/07 |
Plan Sheet / Specification
Reference= Bid item #66 - Rock Staining
Question= Plan sheet 432 of 839 calls for Rock Staining left the SD-15M Line from Sta. 283+00 to 285+00. Our takeoff of this area from the cross sections sheets shows approximately 5,000 m2, not the bid item quantity of 50,000 m2. Are there additional areas of rock staining? If so, we need to know so that we can evaluate the type of access to the work area.
|
|
11
Q:12/21/07 |
Plan Sheet / Specification
Reference= Sheet 742 of 839
Question= For the (8) CIDH
piles at the Poway Rd OC:
|
|
12
Q:12/21/07 |
Plan Sheet / Specification
Reference= Sheet 742 of 839
Question= For the (8) CIDH
Piles on the Poway Road OC:
|
|
13
Q:12/21/07 |
Plan Sheet / Specification
Reference= Sheet 348 & 349; Traffic Control
Question= Please clarify the
Traffic Control plans for stages 4C & 5A. It appears as
though there is no consideration of the traffic control required to
install the (8) CIDH piles at the Poway Rd OC; specifically the (4)
piles that make up Bent 3.
|
|
14
Q:12/21/07 |
Plan Sheet / Specification
Reference= Bid Item 40 - Remove Retaining Wall (Portion) Plan sheets X-1 => X-20, Q-2 Question= Bid Item 40 - (Remove Retaining Wall (Portion) has a pay quantity of 2200 M. Portions of the walls are shown on the typical cross sections with a note which states, “Remove Retaining wall to 1 m below finish grade. The contract documents do not contain any pertinent information regarding these walls such as the wall height (H) or bottom of footing elevations. Without the information above, it is not feasible for the contractor to properly ascertain the actual quantity of retaining wall to be removed. Please provide the above information or the walls as built drawings.
|
|
15
Q:12/26/07 |
Plan Sheet / Specification
Reference= Bid Item 43-Remove Pop-Up,Plan Sheet 104 of 839--
Specification Section 10-1.33 Remove Pop-Up Subsection on page 263
Question= Do the As Built
Drawings mentioned in previous answers have plan sheets that provide
more detail(dimensions,cross section etc)for the Pop-Ups so that an
accurate estimate of cost and work can be completed for their
removal?
|
|
16
Q:12/27/07 |
Plan Sheet / Specification
Reference=
Question= Addendum 2 states
that this project is a part of a pilot program for “Design Sequencing”.
|
|
17
Q:12/28/07 |
Plan Sheet / Specification
Reference=
Question= Is it possible to
extend the bid date based upon the current
|
|
19
Q:12/31/07 |
Plan Sheet / Specification
Reference= Plan sheets 817 and 822. Barrier Slab for retaining wall
301ML.
Question= Stage 4A drawing
(sheet 343)
|
|
20
Q:12/31/07 |
Plan Sheet / Specification
Reference=Special Provisions Section 10-1.16 Cooperation.
Question=The last paragraph of
Section 10-1.16 states that Traffic Chart number 19 shall not be used
until Contract numbers 11-080934 and 11-080944 are completed and opened
to traffic. When will these two projects be completed and opened
to traffic?
|
|
21
Q:12/31/07 R:01/02/08 |
Plan Sheet / Specification
Reference=
Question= Are the core boxes
from the exploratory drilling available for viewing and who is the
contact person for scheduling an appointment?
|
|
22
Q:01/02/08 |
Plan Sheet / Specification
Reference= Contract Plan Sheet # 580 Lighting and sign illumination
plans
Question= As I mentioned over the telephone, as I progressed through the lighting & sign illumination plans the designers started leaving run numbers out of the deltas. Moreover, they left off any other reference to run numbers. Since they combine sign lighting, CMS, CCTV and F.O. on the same plans it is difficult to determine their intent. Also the four traffic signal plans are missing from the electrical drawings. Please advise.
|
|
23
Q:01/03/08 |
Plan Sheet / Specification
Reference= Item 80 - Steel Soldier Piling
Question= Is there a requirement to clean and paint the steel soldier piles?
|
|
24
Q:01/03/08 |
Plan Sheet / Specification
Reference= BI 161 & 162 - CIDH (Sign Foundation)
Question= Is additional sign information forthcoming? The summary tables are blank.
|
|
25
Q:01/03/08 |
Plan Sheet / Specification
Reference= Item #107, Special Provisions Section 10-1.51 - Grind
Existing Concrete Pavement.
Question= The special provisions section 10-1.51 state that this work shall consist of grinding existing PCCP as shown on the plans. Where on the plans is the grinding of the existing PCCP shown?
|
|
26
Q:01/04/08 |
Plan Sheet / Specification Reference= Bid item#63, plan sheet #839 Question=Can you please provide the roadway layout line and stationing for the location of the Bridge Removal (Portion), Location D.
|
|
27
Q:01/07/08 |
Plan Sheet / Specification Reference= Stage Const Plans SC1, SC19, SC20, SC26, SC32-SC34. Question= These sheets indicate "Temporary Paving" in
areas "cross hatched" per legend. It doesn't appear these areas
are included in the quantity sheets for asphalt & could not find
thickness requirement of AC. Please confirm that all asphalt
placed as "Temporary Paving" for detour will be
|
|
28
Q:01/07/08 |
Plan Sheet / Specification Reference= Plan Sheet # 839, Bent Details for rebar cages of the CIDH Pile & Column. Question= Current design spacing of #22 Hoops for CIDH
Piles are @ 102mm. This tabulates to 4" O.C. spacing for the hoops
(horizontal ties). Per the current Caltrans Bridge Design Details, this
does not meet your minimum spacing of at least a 5" x 5" window for
concrete flow.
|
|
29
Q:01/08/08 |
Plan Sheet / Specification Reference= Various items and Standard Specification Section 2 as amended June 19,2003 Question= Ref page 19 of the Special Provisions, Section
2-1.03 first paragraph. Request your confirmation that bid items of
work affected by the Design Sequence Method, which are
patently ambiguous, incomplete and contradictory at time of the bid,
cannot be ascertained as to charater, quality of work and scope of work.
|
|
30
Q:01/08/08 |
Plan Sheet / Specification
Reference= Question= IS THIS A QC/QA JOB
|
|
31
Q:01/08/08 |
Plan Sheet / Specification
Reference= X1, L6 - L8, QUANTITY SHE Question= Regarding your response to question 27
regarding detour paving. The X1 Typical indicates the detour as Typical
Section # 9, 90 mm AC. The only location Section 9 is indicated
on the layout drawings is on sheets L6 - L8, on the outside of Ramp R
22 A. The area indicated is approximately
|
|
32
Q:01/09/08 |
Plan Sheet / Specification
Reference= Special Provisions
10-1.45 Agg Base Question= Section 10-1.45 states that base must comply
with Section 26 of Standard Specifications which limits the amount of
reclaimed material to 50%. Will the Contractor be permitted to use more
than 50% reclaimed material?
|
|
33
Q:01/09/08 |
Plan Sheet / Specification
Reference= Special Provisions
10-1.36 Earthwork Page 275 General Blasting Safety Plan, items R & S Question= Which traffic chart should the Contractor use
to close the freeway for blasting, resolve misfires or other
phenomenon? If none of the existing charts apply, will the engineer
please issue one for bidding.
|