| CONTRACT NO: | 11-2T0814 |
| ROUTE / KP | 11-SD-15-M41.8/R48.6 |
| LOCATION | In San Diego County In And Near Escondido At Various Locations From 0.1 Km South Of Highland Road Overcrossing To 0.2 Km North Of Ninth Avenue Undercrossing |
| DESCRIPTION | To Construct Managed Lanes - North Segment |
| ESTIMATE | $ 57,000,000 |
| WORKING
DAYS |
900 |
| ADVERTISE DATE | 07/21/2008 |
| BID OPENING | 09/18/2008 10/16/2008 10/23/2008 |
| FINAL POSTING |
10/22/08
@ 1510 |
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| X-SECTIONS 07/23/08 |
|
|
|
|
ORDERING
PROJECT PLANS AND SPECIFICATIONS
ADDENDUM
|
|
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:07/22/08 |
Plan Sheet / Specification
Reference= Special Provisions Section 5-1.06 Project Information
Question= When will the
electronic cross sections be available to download for our use?
MESA REPROGRAPHICS 5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to plot@mesareprographics.com San Diego, CA 92123 |
|
2
Q:07/30/08 |
Plan Sheet / Specification
Reference= 243(s) - 246(s), 249(s) - 250(s), 252(s) - 258(s) and 260(s)
Jacking/Drilling operations.
Question= 1) For the 2"
and 3" Drilling installations, are you calling for
2)Are the MDCS ducts to be installed within casing? If so, what type?
3)Where is MVDS defined in
the specs and what type of conduit is this calling for?
4)How are the individual
drilling locations delineated on the plan
sheets? I am not seeing them.
|
|
3
Q:08/14/08 |
Plan Sheet / Specification
Reference= Staging for Southbound 15L1 line Sta 488+20 to 489+00 and
for R4NA Ramp, right side.
Question= Please clarify in which Stage the section on Southbound 15L1 from 488+20 to 489+00 and for Right Side of R4NA Ramp. It appears traffic is kept on existing ramp through Stage 4, but I don't see the stage to remove the existing ramp and complete right side of ramp and sectin on 15L1.
|
|
4
Q:08/14/08 |
Plan Sheet / Specification
Reference= Bid Itme #108, 750mm CIDH pile rebar cages. Sheet 673 of 796
in the contract plans. Abutment details No. 4.
Question= Hoop spacing for
CIDH pile reabr cages does not met your current 1992 design memo
requirements for distance between reinforcing steel. The minimum
states 5" x 5" windows. With your hoops currently show @ 75mm
(3") the actual distance between the rebar will be 2 1/2 ".
|
|
5
Q:08/21/08 |
Plan Sheet / Specification
Reference= Bid Item 134, Masonry Sound Walls Sheets 430-434
Question= On sheet 434 it
shows the horizontal steel to be 600mm or 2 ft. on centers, but on
sheet 430 on the typical section it points to the wall and references
B15-1 on the Standard Plans which shows the horizontal steel to be 4
ft. on centers, which has been the case on all state projects to date.
Does the State want the steel on 2ft. center or 4ft? If 2 fts is
required then would it be possible to grout the wall solid in order to
save time and labor from stopping every 2 ft to grout? the cost of the
additional grout (25%) would be cheaper that the labor.
|
|
6
Q:08/21/08 |
Plan Sheet / Specification
Reference= Bid Item 134,
Masonry Sound Walls Sheets 430-434
Question= There seems to be
some kind of pattern or design attached the walls that is not shown on
the Details sheet 434. Can you please clarify what this is?
|
|
7
Q:08/26/08 |
Plan Sheet / Specification
Reference= Bid Item 112,
400MM CIDH Pile (Sound Wall)
Question= What soil friction
angle is to be used to determine pile length and spacing?
|
|
8 Q:09/05/08 |
Plan Sheet / Specification Reference= Question= What is the requirement for constructing CIDH
piles with less than 3 diameters center to center
|
|
9 Q:09/12/08 |
Plan Sheet / Specification Reference= Question= In the Notice to Bidders, the telephone number
(916) 654-4990 is for another state agency. Can the correct
telephone number be provided to where the Bid Documents may be viewed.
|
|
10
Q:09/22/08 |
Plan Sheet / Specification
Reference= Item #
86 50 mm Water meter Item # 87 75 MM Water Meter Question= There are no
specifications as to what water district these in and will there be a
specifications for these line items or an estimated cost for them
provided?
|
|
11
Q:09/22/08 |
Plan Sheet / Specification
Reference= Cross sections
Question= Where can I find the
cross section for “R-3CA” Line? (Citracado Parkway N/B Off Ramp). The
cross section for the subject line is not posted on the internet.
|
|
12
Q:09/25/08 |
Plan Sheet / Specification
Reference= TRANSITION BARRIER ON C-10, C-17, C-18, C-19... NO METHOD OF
PAY EXISTS.
HOW ARE THE
TRANSITIONAL CONCRETE BARRIERS PAID FOR?
|
|
13
Q:09/25/08 |
Plan Sheet / Specification
Reference= BID ITEM 219, CB 60AR...
Question= WHERE IS THIS
BARRIER LOCATED?
WHAT STANDARD SHOULD BE USED
FOR 60"AR"?
|
|
14
Q:09/25/08 |
Plan Sheet / Specification
Reference= PLAN SHEET C-19....CONCRETE BARRIER 60"R1"
Question= WHAT BID ITEM PAYS
FOR CONCRETE BARRIER 60R1 ???
|
|
15
Q:09/25/08 |
Plan Sheet / Specification
Reference= Item 247, Changeable Message Sign
Question= Bid item 247,
Changeable Message Sign System has no plan or material sheet in the
specs. There is no way to estimate the item. Please clarify.
|
|
16
Q:09/25/08 |
Plan Sheet / Specification
Reference= X-SECTION SHEETS
Question= WHERE CAN I FIND THE
X-SECTION FOR THE CITRACADO OFF RAMP? I HAVE ASKED THIS QUESTION BEFORE
BUT I WAS REFERED TO CROSS SECTION FOR CITRACADO ON RAMP.
|
|
17
Q:09/29/08 |
Plan Sheet / Specification
Reference= The following bid items share the same discription: BI 225 & 229 - concerte barrier (type 736 Mod) BI 253 & 254 - temp closed circut television Question= What dose each bid item scope include or cover...?
|
|
18
Q:09/29/08 |
Plan Sheet / Specification
Reference= Items 213,214
Question= Information for
above items could not be found in the special provisions. Will this be
added? Please advise
|
|
19
Q:10/01/08 |
Plan Sheet / Specification
Reference= 183 JACKIGN 900 MM WSP (50 MM THICK)
Question= The jacking subs are
questining the thickness of the pipe. According to them, in most cases
for Caltrans project the specified thickness is around (15mm) 1/2 ". Is
50 mm the correct thickness?
|
|
20
Q:10/07/08 |
Plan Sheet / Specification
Reference= DD 21 Low Clearence Culvert Details
Question= Can an optional
construction joint be installed at top of pipe?
|
|
21
Q:10/09/08 |
Plan Sheet / Specification
Reference= Items # 74, 78, 83 and 84 as per revised bid form per
addenda 2 issuance. SP Section 10-2.01, Highway Planting and Irrigation
Cost Breakdown example schedules as shown per addenda 2 issuance and as
per original SP issued, Section 10-2.01 page 244 through 246. Highway
planting sheets PP-12, PP-13, and IP-16 (plan sheets 516, 517, and
533).
Question= The previous noted
addenda 2 cost breakdown schedule examples are different from the
original examples as isssued in the initial set of Special Provision.
But addenda 2 does not make any mention of plan sheet changes or
elimnation of what is shown on those plan sheets.
|
|
22
Q:10/09/08 |
Plan Sheet / Specification
Reference=
Question= I know I have asked
the question before, but the jacking subs are still insisting that the
2-inch casing is too big and it should be half inches thick. They site
past Caltrans project with similar situation. We will bid it as 50 mm
thick casing. But it is going to very expensive. Can you check and make
sure that the designers did not make a clerical mistake?
|
|
23
Q:10/09/08 |
Plan Sheet / Specification
Reference= #49, Remove Concrete (Ditch), G-10 to G-13
Question= There is an existing
concrete channel that runs on the west side of the South Bound Lanes
from Sta 481+00 - 489+82 (+/-). Drainage System(DS)-13 is in line
with the concrete channel. The concrete channel will need to be
removed in order to complete DS-13. What bid item will this work
be paid under?
|
|
24
Q:10/10/08 |
Plan Sheet / Specification
Reference= Items 100, 96, 93 Plan sheet 3,4,5,6
Question= The designed
pavement grade break at the ETW, .6 meters from the a/c shoulder, is
not an industry standard practice. This design causes constructiblity
issues at all levels of the pavement section. Industry standard
equipment cannot put a break that close to an edge. Will Caltrans
consider moving the grade break to the joint between AC and PCC?
|
|
25
Q:10/14/08 |
Plan Sheet / Specification
Reference= Item No. 134 Sound Wall (Masonry Block)
Question= Please clearly state
if the CMU walls for the aesthetic pattern have split-face on one-side
(freeway side)or if the walls have split-face on both sides (freeway
& residential).
|
|
26
Q:10/14/08 |
Plan Sheet / Specification
Reference= PLAN SHEET...603
Question= Reference is made to
sheet RSP P18???? Where is it?
|
|
27
Q:10/14/08 |
Plan Sheet / Specification
Reference= PLAN SHEET..."L" Example of one: sta 482+00 - 486+00 on 15L1
Question= There are alot of
tapering PCC sections... when the taper is less than one lane...must it
be tied? Do you want to have a 1.2 m wide section with isolation joint?
|
|
28
Q:10/14/08 |
Plan Sheet / Specification
Reference= Special Provision Section 8-2.02 CORROSION CONTROL FOR
PORTLAND CEMENT CONCRETE
Question= 8-2.02 states that
portland cement concrete at slag embankments is considered to be in a
corrosive environment. Please identify the structures that this
section applies to.
|