| CONTRACT NO: | 11-276204 |
| ROUTE / KP | 11-SD-805-9.8/12.9 |
| LOCATION | In San Diego County In Chula Vista And Bonita From 0.1 Km North Of Telegraph Canyon Road Undercrossing To 0.4 Km North Of Bonita Road Undercrossing. |
| DESCRIPTION | Ramp Widening, Ramp Metering, Highway Planting And Irrigation Systems. |
| ESTIMATE | $ 3,920,000 |
| WORKING
DAYS |
430 390 (Including 250 Working Days of Plant Establishment) |
| ADVERTISE DATE | 12/03/2007 |
| BID OPENING | 02/14/2008 02/28/2008 06/12/08 |
| FINAL POSTING | 06/11/08
@ 1525 |
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| CROSS SECTIONS |
|
|
|
|
| REVISED CROSS
SECTIONS Posted 05/27/08 |
| ADDENDUM
#1 Posted 01/24/08 |
ADDENDUM
#2 Issued 02/01/08 |
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:12/19/07 |
Plan Sheet / Specification
Reference=
Question= When will the cross
sections be available for download?
MESA REPROGRAPHICS 5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to plot@mesareprographics.com San Diego, CA 92123
|
| 2 Q:12/20/07 R:02/01/08 |
Plan
Sheet / Specification
Reference= 37
GEOSYTHETIC REINFORCEMENT PLAN SHEET 18 SPECIALS PAGE 223 Question= PLANS SHOW 4.5M OF REINFORCEMENT AND .45M OF BASKET WIDTH FOR EMBANKMENT OF THE STABIZED SLOPE. YET CROSS SECTIONS DO NOT SHOW THIS DESIGN. SPECIALS ON PG 223 UNDER MEASUREMENT AND PAYMENT DO NOT MENTION EXCAVATION AS A COMPONENT OF THE ITEM. PAGE 221 (GRADING) TALKS OF STRUCTURE EXCAVATION TO ACHIEVE LINES AND GRADE, YET THERE IS NO STRUCTURE EXC ITEM. WILL THE EXCAVATION REQUIRED, TO ACHIEVE THE 4.5M EMBEDMENT, BE PAID IN ROADWAY EXCAVATION?
|
| 3 Q:12/31/07 R:02/01/08 |
Plan
Sheet / Specification
Reference= 37
GEOSYTHETIC REINFORCEMENT PLAN SHEET 18 SPECIALS PAGE 223 Question= Sheet number 4 of 122, Typical Cross Section X-3 of the Contract Documents shows a typical section between Stations 135+80.00 to 137+16.58 "B-2" Line. There is an arrow pointing to the face of the slope and a comment under the directional arrow stating "(SEE Const DETAIL SHEETS). Sheet numbers 8 and 9, Layout sheets also reference the Const detail sheet. Sheet 18 of 122, C-4, Construction Details, shows a typical section and details of the geosynthetic reinforcement. The details indicate the use of a welded wire half basket at the face of the slope. The Specification Special Provisions Section 10-1.30 Geosynthetic Reinforced Embankment has a subheading; Geosynthetic Reinforcement. Page 220 & 221, included in this section, Discusses the material and placement of the welded wire half basket. Page 223, Measurement and Payment for work in this section does not include the welded wire half baskets in the description of items to be included in the payment for the geosynthetic reinforcement. Under what item are the payment for the welded wire half baskets to be included? Thank you.
|
| 4 Q:01/16/08 R:02/01/08 |
Plan
Sheet / Specification
Reference= ITEM #22 REMOVE YELLOW THERMO STRIPE. PLAN SHT. # TH-1 & 2 (T-2 LINE) TH-3 (H-2A LINE & H-1 LINE) TH-4 (B-2 LINE) Question= BID ITEM 22 INCORRECT IN ITS WORDING (SHOULD READ"YELLOW PAINT") TH-1 & 2 NO THERMO EXISTS. (ALL OLD PAINT) TH-3 NO THERMO EXISTS. (H-2A LINE IS OLD PAINT) (H-1 LINE WAS REMOVED AND REPAINTED WITH NON LEAD PAINT 2-3 YRS AGO.) TH-4 NO THERMO EXISTS. (ALL OLD PAINT) PLEASE RE-EXAMINE THIS WORK AND ISSUE AN ADDENDUM.
|
| 5 Q:01/24/08 R:06/09/08 |
|
| 6 Q:01/24/08 R:02/01/08 |
Plan
Sheet / Specification
Reference= Item No. 37, Geosynthetic Reinforcement. Plan Sheet
No. 18 of 122. Special Provisions page 221. Question= Are there any tolerance specifications relating to the strut spacing? The spacing seems excessive. Have the structs been analyzed for structural competence at this spacing? Realistic strut spacing in the absence of a tolerance specification should be a maximum of 0.45m.
|
| 7 Q:01/30/08 R:02/01/08 |
Plan
Sheet / Specification
Reference= 12 Question= The staging drawings supplied in the plans for the work to be accomplished at the "H" St. ramp only allow for a portion of the work to be completed. There is a whole second stage of work that must be accomplished outside of the staging provided. How does Caltrans expect the contractor to accomplish this work? Will there be staging drawings issued by addenda which show us how traffic is to be managed in order to accomplish this work?
|
| 8 Q:02/05/08 R:02/XX/08 |
Plan Sheet / Specification
Reference= 37, Geosynthetic Reinforcement, Dwg. 18 of 122, Spec.
Prov. 10-1.30 : Page 122 1st paragraph.
|
| 9 Q:05/27/08 R:06/09/08 |
Plan Sheet / Specification
Reference=
|
| 10 Q:05/29/08 R:06/05/08 |
|
| 11 Q:05/29/08 R:06/05/08 |
Plan Sheet / Specification
Reference=
|
| 12 Q:06/09/08 R:06/09/08 |
Plan Sheet / Specification
Reference=
|