| CONTRACT NO: | 11-270304 |
| ROUTE / KP | 11-SD-79-7.5/8.5 |
| LOCATION | In San Diego County Near Paso Picacho From 1.9 Miles South Of Paso Picacho Camp Ground To 0.9 Mile South Of Paso Picacho Camp Ground. |
| DESCRIPTION | Install New Culvert, Upgrade Culverts, And Repair Erosion. |
| ESTIMATE | $ 650,000 |
| WORKING
DAYS |
150 (Including 60 Working Days of Plant Establishment) |
| ADVERTISE DATE | 12/17/2007 |
| BID OPENING | 01/24/2008 |
| LAST POSTING | 01/23/08 @ 15:40 |
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| INFORMATION
HANDOUT 12/27/07 |
|
|
|
|
| INFORMATION
HANDOUT 01/16/08 |
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:01/18/08 |
Plan Sheet / Specification
Reference= Item #31 minor concrete ditch lining and Item #14 Prepare and stain concrete and rock. Question=What surfaces will the staining be applied to. What is
the finish on the ditch lining
|
|
2
Q:01/22/08 |
Plan Sheet / Specification
Reference= Various:Sec 19-3.025C
Question= Are trench plates allowed, and how long can they remain in place? Are there any special requirements on how the plates are placed?
|
|
3
Q:01/22/08 |
Plan Sheet / Specification
Reference= Sec. 19-3.025C
Question= Soil cement backfill requires an 8 hour cure time before backfill. How can this waived in order to backfill at the end of each working day?
|
|
4
Q:01/22/08 |
Plan Sheet / Specification
Reference= Item #21
Question= Is this item intended to pay for that zone "above" the top of the pipe for the limits shown on the profiles,
and that area below that zone would be bedded according to the standard specifications and paid for within the price of the pipe bid items?
|
|
5
Q:01/22/08 |
Plan Sheet / Specification
Reference= Item #11
Question= Is this item intended to pay for all of the grading shown to be required at the end of the various drainage systems exclusive of the ditch excavation?
|
|
6
Q:01/22/08 |
Plan Sheet / Specification
Reference= Various
Question= For purposes of Pavement replacement over the culverts what standard references the limits of trench patch repair?
|
|
7
Q:01/22/08 |
Plan Sheet / Specification Reference=Section 8-2, Placing Concrete Question=Regarding transit time for concrete, will exceptions be made or time extensions be given since the concrete would arrive after 90 minutes?
|