MANDATORY PREBID MEETING FOR CONTRACT 11-260714 IS ON MONDAY, MARCH 10, 2008 AT THE FOLLOWING LOCATION: 4050 TAYLOR STREET, SAN DIEGO, CA 92110
MEETING WILL BE HELD AT BUILDING 1, FIRST FLOOR, ROOM 134 (GALLEGOS ROOM), FROM 8:00 A.M. - 10:00 A.M.
PLEASE CALL (619) 688-6635 OR (858) 688-1522 WITH QUESTIONS.| CONTRACT NO: | 11-260714 |
| ROUTE / KP | 11-SD-15, 56-M30.3/M35.3, 13.8/14.6 |
| LOCATION | In San Diego County In San Diego On Route 15 From 1.4 Km South Of Route 56/15 Separation To Camino Del Norte Undercrossing And On Route 56 From 0.5 Km West To 0.2 Km East Of Route 56/15 Separation. |
| DESCRIPTION | Highway Planting To Be Performed And Irrigation To Be Installed. |
| ESTIMATE | $ 2,800,000 |
| WORKING DAYS | 1050 |
| ADVERTISE DATE | 02/19/2008 |
| BID OPENING | 03/27/2008 |
| FINAL-POSTING | 03/27/08 @ 07:45 |
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
| PREBID SIGN-IN SHEET 03/10/08 |
| ADDENDUM
#1 Issued 03/14/08 |
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:03/10/08 |
Plan Sheet / Specification
Reference= Plan Sheet 5,6 & 7 , SR-56 & I-15 interchange &
surrounding area, interchange zone.
Question= This area has had a considerable amount of rock generated in both the past and present. Much of it was buried on-site. Does Caltrans have information as to the depth of cover over this rock?
|
|
2
Q:03/10/08 |
Plan Sheet / Specification
Reference= Plan Sheet 28 ,29,52 & 53 of 108
Question= Plans show C-2 but
no trees or plans are shown on the corresponding planting pages , is that a specific system?
|
|
3
Q:03/14/08 |
Plan Sheet / Specification
Reference= Bidform in general
Question= Is this to be a lump sum contract or will unit prices be applied to field measured quantities?
|
|
4
Q:03/18/08 |
Plan Sheet / Specification
Reference= Specifications
Question= Is there a good faith effort REQUIRED and what type of documentation are we to provide demonstrating our efforts? Is the successful bidder REQUIRED to have a percentage of work performed by a SBE subcontractor or supplier?
|
|
5
Q:03/19/08 |
Plan Sheet / Specification
Reference= Bid Item #59, Sheets IP-5, IP-6, IP-7, and LD-5.
Question= The "Irrigation
Crossover" table on sheet LD-5 indicates the location of 200 MM WSP
crossovers. Sheet IP-5 does not show an irrigation crossover as
indicated on the table. Please verify if there is in fact a crossover
to be installed at the station indicated (56M, station 162+95).
|