MANDATORY PREBID MEETING FOR CONTRACT 11-167884 IS ON TUESDAY, JANUARY 8, 2008 AT THE FOLLOWING LOCATION: 4050 TAYLOR STREET, SAN DIEGO, CA 92110
MEETING WILL BE HELD AT BUILDING 2, FLOOR 2, ROOM 203A (MISSION BAY CONFERENCE ROOM), FROM 9:00 A.M. - 12:00 P.M.
PLEASE CALL
(619) 688-6635 WITH QUESTIONS.
| CONTRACT NO: | 11-167884 |
| ROUTE / KP | 11-Imp-78,111-R19.5/R24.5 |
| LOCATION | In Imperial County Near Brawley |
| DESCRIPTION | Construct 4-lane divided expressway and interchange |
| ESTIMATE | $ 78,000,000 |
| WORKING
DAYS |
650 |
| ADVERTISE DATE | 11/19/2007 |
| BID OPENING | 01/24/2008, 2/14/2008 |
| FINAL POSTING | 02/13/08 @ 17:50 |
The Caltrans District
11
Office is located at 4050 Taylor Street, San Diego, CA 92110. The
District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| Rail Road Agreement
Documents |
|
|
|
|
| PROJECT INFORMATION 1 11/28/07 |
PREBID
SIGN-IN SHEET 01/08/08 |
| ADDENDUM
#1 Posted 01/16/08 |
ADDENDUM
#2 Issued 01/24/08 |
BIDDER'S INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:11/21/07 |
Plan Sheet / Specification
Reference= Bid Item #100 - Clean and Paint Steel Soldier Pile, Specification Section 10.1.62 - Clean and Paint Steel Soldier Piling Question= The specifications
call for a light abrasive blast and a final coat of inorganic zinc to
be applied in the field after installation of the piling.
|
|
2
Q:11/27/07 |
Plan Sheet / Specification
Reference= page 154 of the special provisions section 5-1.26
Question= What can we get in
an electronic format?
How do we get It?
Does this also include the
cross sections mentioned in 5-1.17 ?
|
|
3 Q:11/30/07 |
Plan Sheet / Specification
Reference= Item 43, 1,070,000 M3 Imported borrow type D
Question= Is there a designated borrow site for this material and will this have to be trucked in?
|
4 Q:12/06/07 R:12/07/07 R:12/12/07 |
Plan
Sheet / Specification
Reference= Special Provision 5-1.26 Question= Dear Mr. Adibi: Please forward Granite Construction
Company Land XML, dwg or dgn files that contain the following vector
information for the Brawley Bypass 78/111 job in Imperial County:
|
5 Q:12/07/07 R:12/07/07 |
Plan
Sheet / Specification
Reference= Plan Information
Question= Are the design files (i.e. CADD or MicroStation) available to contractors?
|
|
6
Q:12/11/07 |
Plan Sheet / Specification
Reference=
Question= How soon will the plan cross sections be made
available?
|
7 Q:12/11/07 R:12/12/07 |
Plan
Sheet / Specification
Reference=
Question= Subject: Requesting
Grading Geometry Files for Contract No. 11-167884
|
|
8
Q:01/02/08 |
Plan Sheet / Specification
Reference= special provisions, page 180 paragraph 10-1.01 oder of
work.
Question= The Table included indicates that by bid time all 4
listed Right of Way parcels will be available...Is this the
case?
|
| 9 Q:01/08/08 R:01/08/08 |
Plan
Sheet / Specification
Reference= Question= Contractor furnished sign panels. Does inspection need to be done at the MFR?
|
| 10 Q:01/08/08 R:01/08/08 |
Plan
Sheet / Specification
Reference= Special Provisions Section 2-1.02, page 127. Question= Please clarify if there is a DBE " % " participation goal, if so, what is the %.
|
| 11 Q:01/08/08 R:01/08/08 |
Plan
Sheet / Specification
Reference= Question= Is there a requirement to continue with data collection during construction?
|
|
12 R:01/13/08 |
Plan
Sheet / Specification
Reference= Question= Does the owner own any land in the vicinity of the Brawley area?
|
| 13 Q:01/08/08 R:01/18/08 |
Plan
Sheet / Specification
Reference= Plan Sheet No. 228 of 462. Stage construction and
traffic handling Stage 1 Question= Does the "P" Line have to be 100% complete before we begin Stage 2 (ie pcccp and paving etc)?
|
| 14 Q:01/08/08 R:01/08/08 |
Plan
Sheet / Specification
Reference= Question= Electronic information regarding grading available?
|
| 15 Q:01/08/08 R:01/08/08 |
Plan
Sheet / Specification
Reference= Special Provisions Section 10-1.33 6th paragraph
Question= Is the term "finished grade" intended to apply to fill slopes and graded medians?
|
| 16 Q:01/08/08 R:02/01/08 |
Plan
Sheet / Specification
Reference= Special provisions Section 13 "Railraod relations and
insurnace requirements" Question= Several times the "specs" mention Appendix 1 and also Exhibit B. Where are these? Also the paragraph 13.-1.01 states " The Contractor acknowledges its reciept of etc-etc-----------" Where is this. We will need a copy of this "right of entry aggrement" for estimating Insurance costs as required in 13-2.
|
| 17 Q:01/15/08 R:02/11/08 |
Plan
Sheet / Specification
Reference= Plan Sheet 336 (and others) "Permeable Material (Blanket)
Detail" and Special Provisions Section 10-1.65 Question= Is the permeable material (Blanket)surrounded by filter fabric? How many layers of filter fabric are required?
|
| 18 Q:01/22/08 R:01/30/08 |
Plan
Sheet / Specification
Reference= Addendum 1 Question= If this job goes out for bid again will another prebid meeting be held so additional contrators can bid this project?
|
|
19 R:02/13/08 |
Plan Sheet / Specification
Reference= Addendum No 3.
Are the quantities shown on the bid schedule derived from the supplied cross sections or are they calculated from another source?
The soils
report(foundation recommendations for Brawley Beef Way UC) states that
the contractor can expect 6 to 12 inches settlement over the
period of construction for the deepest fills yet you have reduced the
subsidence quantity from 110,756 cubic meters to 26,320 cubic meters.
We assume that the quantity of fill remains the same so why is the
quantity reduced?
|
| 20 Q:02/07/08 R:02/13/08 |
Plan Sheet / Specification
Reference= Item 7: Temporary Erosion Control
|
|
21 |
Plan
Sheet / Specification
Reference= Item 61, Concrete Pavement, Special Provisions Section
10-1.44 Question= Section 10-1.44 of the Special Provisions, subsection "Dowel Placement" states, "Dowel bars shall be placed as shown on the plans using dowel bar baskets." Provided that the Contractor can install dowel bars in conformance with the specified tolerances, will the state allow for placement of dowel bars by the "insertion method"?
|