The responses to bidder' inquiries, unless incorporated into a formal addenda to the contract, are not a part of the contract and are provided for the bidder's convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The responses may be considered along with all other information furnished to prospective bidders for the purpose of bidding on the project. The availability or use of information provided in the responses to bidder' inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.
Caltrans District 11 Construction Department has developed this method of answering Bidders Inquiries to better serve the needs of the Contractors who bid on our Projects.
The BIDDER'S INQUIRIES & RESPONSES will be updated continuously with the last posting no later than 15:00 on Wednesday prior to the bid opening.
Caltrans District 11 Construction Department will post all of the questions submitted by any of the registered Planholders for that Contract, but reserves the right not to answer any questions deemed unsatisfactory for public viewing.
|
02/25/00 |
03/03/00 |
03/15/00 |
03/20/00 |
|
|
Inquiry |
|
|
Plan Sheet / Specification Reference=Addendum
No.2
Is it your intent that the contractor handle the slurry residue twice? First, transport to a drying location and then haul the dry residue somewhere else. The interpretation is for the contractor to properly dispose of all residue, the number of times it is handled will be determined by the contractor. |
|
|
Plan Sheet / Specification Reference=PLAN
SHEET #27, Item # 8 and Item # 9
LINE NO. 17 and 18 ARE THE IDENTICAL LOCATION. PLEASE CLARIFY. Line 17 and Line 18 are not identical locations.
|
|
|
Plan Sheet / Specification Reference=PLAN
SHEET #27, Item # 8 and Item # 9
LINE NO. 21 REQUIRES 2 TEMP CRASH CUSH ON A SINGLE RUN. PLEASE CLARIFY. PLAN SHEET #27 ON WHICH SHOULDER IS THE K-RAIL TO BE PLACED? Line No. 21 is shown as Stage 2 on plan sheet 9, the location of k-rail is shown. |
|
|
Plan Sheet / Specification Reference=PLAN
SHEET #27, Item # 8 and Item # 9
PLAN SHEET #27 NOTE ** REFERS TO A PLAN SHEET C-4, THERE IS NO PLAN SHEET C-4. PLEASE CLARIFY. Refer to plan sheet C-3. |
|
|
There is conflict between traffic chart
10 & 14.
Stage 1 & Stage 2 shown on plan sheet 8 & 9 require a minimum of 3 ramp closures. There is no detour shown for the ramp closures for Regents Road. The requirements for Chart No. 10 are stated under the remarks and should be bid accordingly. |
|
|
Plan Sheet / Specification Reference=Addendum
No. 4
If this detail is to address the much discussed "AGGREGATE FIN" controversy, shouldn't there be a dimension indicated for the distance between centerlines of blades? No. |
|
|
Plan Sheet / Specification Reference=Item
# 29 GRIND EXISTING CONCRETE PAVEMENT
Will there be an addendum effecting the specifications pertaining Item #29 before this Thursday's bid on the referenced contract? No. |
|
|
Plan Sheet / Specification Reference=MATERIALS
INFORMATION BROCHURE DATED
SEPTEMBER 3, 1999 Will there be any updates to this information? No. Per Addendum No. 2 the previously issued
Materials Information Brochure dated September 3, 1999 is no longer valid
and no locations will be provided.
|
|
|
Plan Sheet / Specification Reference=Items
21, 22, 23, 24 & 25
The typical section shows no backfill behind the dike, but the existing field conditions have backfill behind the dike. To maintain existing conditions will backfill be replaced and how will it be paid since there is no item of pay for import borrow? Any backfill required is fully included in Items 21, 22, 23, 24, & 25 per Section 39-8.02 of the Standard Specifications: Full compensation for any necessary excavation, backfill and preparation of the area shall be considered as included in the contract price paid per meter for place aspahalt concrete dike and no additional compensation will be allowed therefor. |