| CONTRACT NO: | 11-072414 |
| ROUTE / KP | 11-SD-15,163,805 |
| LOCATION | In San Diego County In San Diego At Various Locations. |
| DESCRIPTION | Installation Of Fiber Optic System And Closed Circuit Television System. |
| ESTIMATE | $ 9,951,000.00 |
| ADVERTISE DATE | 08/20/01 |
| BID OPENING | |
| FINAL POSTING | 09/26/01 @ 16:00 |
|
|
GOLDEN STATE UTILITY CO. | $ 6,564,951.50 |
|
|
ROYAL ELECTRIC COMPANY | $ 6,746,602.00 |
|
|
HMS CONSTRUCTION INC | $ 6,815,674.16 |
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered. Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
09/14/01 |
|
|
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
Q:08/28/01 R:09/05/01 |
Plan Sheet /
Specification Reference=
Will it be possible to use Directional Drilling on the majority of this project (Where it is feasible) instead of open trenching?
|
|
Q:08/28/01 R:09/24/01 |
Plan Sheet /
Specification Reference=
Are there Geo-reports available for this job. And if so where can we obtain a copy?
|
|
Q:09/05/01 R:09/05/01 |
Plan Sheet /
Specification Reference=
Could you please e-mail or fax a list
of plan holders to me.
Go to "List of Plan Holders on Projects Out To Bid" enter the contract number and start search. |
|
Q:09/10/01 R:09/13/01 |
Plan Sheet /
Specification Reference=Special Provision Section 2-1.02 Disadvantaged
Business Enterprise (DBE)
Relative to Advertisement requirement. How many days prior to the Bid date does the advertisement need to be published?
|
|
Q:09/20/01 R:09/24/01 |
Plan Sheet /
Specification Reference=
As the Notice to Bidder’s did not provide for a scheduled prebid meeting, we were targeting our own job walk. Based on the tragic events of last week in New York and Washington, and the closing of and/or restricted air travel throughout the Country, we have not had a reasonable opportunity to visit the site of the proposed work in the San Diego area. Once we visit the locations, we will also need time to analyze the data secured to maximize the savings within our bid for the Department.
|
|
Q:09/21/01 R:09/21/01 |
Plan Sheet /
Specification Reference=
Can you please provide me with a list of Prequalified Contractors? I have pulled the bidder's list and need a list stating what kind of work each Contractor does. Is there a list stating this? And if so, where?
|
|
Q:09/24/01 R:09/24/01 |
Plan Sheet /
Specification Reference=Item 15: SHOULDER BACKING
What is the unit of measure "STA"?
|
|
Q:09/24/01 R:09/24/01 |
Plan Sheet /
Specification Reference=Item 36: TYPE III SERVICE EQUIPMENT ENCLOSURE
Where do we obtain
information regarding the requirements for this item?
|
|
Q:09/24/01 R:09/24/01 |
Plan Sheet /
Specification Reference=Item 35: TRENCH DELINEATOR
Which Prequalified material meets the requirements of Section 10-3.19?
|
|
Q:09/24/01 R:09/24/01 |
Plan Sheet /
Specification Reference=Item 54: CONDUCTORS
Are there requirements for the conductors?
|
|
Q:09/24/01 R:09/24/01 |
Plan Sheet /
Specification Reference=Item 38: HUB CABINET WITH FOUNDATION
Where are the requirements for the hub cabinet?
|
|
Q:09/24/01 R:09/24/01 |
Plan Sheet /
Specification Reference=Plan sheets E-4 through E-88
There are locations shown on the plans that show trenching across both ramps and the main lanes of the freeway? Is the intent to trench?
|
|
Q:09/25/01 R:09/25/01 |
Plan Sheet /
Specification Reference=Item 30: MODEL 334 CABINET FOUNDATION
Where is there information on the requirements of this item?
|
|
Q:09/25/01 R:09/25/01 |
Plan Sheet /
Specification Reference=Item 33: REPLACEMENT OF STATE FURNISHED CABINETS
Is there a wiring diagram for these cabinets?
|
|
Q:09/25/01 R:09/25/01 |
Plan Sheet /
Specification Reference=Item 34: REPLACEMENT OF STATE FURNISHED POWER DISTRIBUTION
ASSEMBLIES.
What work is included in this item?
|
|
Q:09/26/01 R:09/26/01 |
Plan Sheet /
Specification Reference=Item 38: HUB CABINET WITH FOUNDATION
Whom was the supplier of the hub cabinet on the previous fiber optic contract?
|
|
Q:09/26/01 R:09/26/01 |
Plan Sheet /
Specification Reference=SPECIAL PROVISIONS page 87 REMOVE PORTIONS OF EXISTING
STRUCTURES
The surface of the concrete to be removed shall not be impacted within 0.5 m of the pavement to remain in place. How do you do this when the section to be removed is only 0.76 M.
|
|
Q:09/26/01 R:09/26/01 |
Plan Sheet /
Specification Reference=PLAN SHEETS 378-379 LOS PENASQUITOS CREEK BRIDGE
Core drill quantity shows only 11 meters, will the conduit be placed below the end and mid-diaphram?
|
|
Q:09/26/01 R:09/26/01 |
Plan Sheet /
Specification Reference=
Are fiber optic jumpers required at all fiber distribution units? If so how many are required.
|
|
Q:09/26/01 R:09/26/01 |
Plan Sheet / Specification Reference=Special
Provisions, Notice to Contractors
Within the Special Provisions, "Notice
to Contractors" (first sentence), the instructions direct the Bidders to
deliver bids to the Department of Transporation, at 3347 Michelson Drive,
Suite 100, Irvine on the date of the bid. However, the Bid Envelope provided
with the Proposal and Contract, shows the bids to be delivered to: 3337
Michelsen Drive, Suite 100, Irvine.
3347 Michelson Drive - Rm C - 1116 (MS150) Irvine, CA 92612-1692 Publicly Opened and Read in Rm C - 1116 |
|
Q:09/26/01 R:09/26/01 |
Plan Sheet / Specification Reference=ITEM
2: TIME RELATED OVERHEAD.
What is included in the time related overhead item?
|