| CONTRACT NO: | 11-080944 |
| ROUTE / KP | 11-SD-15-M30.0/M44.6 |
| LOCATION | In San Diego County In San Diego And Escondido From 0.7 Km North Of Poway Road Overcrossing To 0.1 Km South Of Clarence Lane Undercrossing. |
| DESCRIPTION | Construct Additional Lanes, Movable Barriers, And Replace Bridges |
| ESTIMATE | $ 37,100,000 |
| ADVERTISE DATE | 02/14/2006 |
| BID OPENING | 04/13/06 05/18/06 |
| FINAL POSTING | 05/17/06 @ 16:15 |
| 1 |
FCI CONSTRUCTORS, INC. | $ 39,572,936.00 |
| 2 |
YEAGER SKANSKA INC. |
$ 49,976,845.00 |
The Caltrans District
11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
|
|
|
|
ADDENDUM
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1 |
Plan
Sheet / Specification Reference=
Question=Will
you please make the cross-sections available for downloading.
5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to plot@mesablueprint.com San Diego, CA 92123 |
|
Q:03/01/06 |
Plan
Sheet / Specification Reference=Special Provisions: Section 10-1.33 Earthwork Question=
45 day settlement periods are required for the roadway embankments at
the
Earth Retaining Structures No. 446L/R and 450L/R.
|
| 3 |
Plan
Sheet / Specification Reference=Bid Item 206 Install Concrete Barrier
(movable).
Specials Provisions Pages 131 State Furnished Materials, Page 376
10-3.48
State Furnished Movable Barrier.
Question=The
Special Provisions state that the movable barrier will be available
some
where in San Diego County.
|
|
Q:03/20/06 |
Plan Sheet / Specification
Reference=Bid
Item #85. Asphalt Concrete, Type A. Sheets 246 & 247.
Question=Detour D-SBCD shown on shets 246 and 247 - Does the detour get construted before or after the final paving during Stage 2?
|
|
Q:03/20/06 |
Plan Sheet / Specification
Reference=Bid
Items #90 & #91. Concrete Pavement, Doweled/Undoweled.
Multiple
sheets, see below.
Question=
|
|
Q:03/20/06 |
Plan Sheet / Specification
Reference=Bid
Item #40. Cold Plane Asphalt Concrete Pavement. Sheet 15
(L-4)
Question=On Ramp VRDSOF, where are the limits of cold plane?
|
|
Q:03/20/06 |
Plan Sheet / Specification
Reference=Bid
Items #133 to #140. Storm Drain Pipes. Question=When will the Contractor be provided plan and profile details for systems 3A, 4, 5, 5A, 6A, 6B, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17?
|
|
Q:03/20/06 |
Plan Sheet / Specification
Reference=Bid
Item #107. Minor Concrete, Pipe Encasement. Sheet 153.
Question=Quantity for drain system 1Af indidcates 0.9 m3 for 61 meters of 600mm encasement. Encasement should be approximately 54 m3. Please verify.
|
|
Q:03/20/06 |
Plan Sheet / Specification
Reference=Bid
Item #107. Minor Concrete, Pipe Encasement. Sheet 153.
Question=Drain system 6ff should be approximately 108 m3. Please verify. Drain system 9g - the quantity is listed in the Class 2 concrete column. The proposed quantities should be approximately 200 m3. Please verify.
|
|
Q:03/20/06 |
Plan Sheet / Specification
Reference=Bid
Item #104. Class 2 Concrete, minor structure. Sheet 153.
Question=Drainage system 3d (1.8 x 1.5 m RCB) - the length does not match the profile. Which is correct?
|
|
Q:03/20/06 |
Plan Sheet / Specification
Reference=Bid
Item #181. Concrete Barrier, 60 Modified. Sheet #64
Question=The detail shown on sheet 64 indicates a 100mm underdrain pipe with permeable material to be installed. Where does this get paid for?
|
| 12 |
Plan
Sheet
/ Specification Reference=Overhead Sign Structures...Sheet 302 of 640
Question=You have a Bid item
and this
sheet for (21) new sign structures. I do not see in the contract
documnet plans where they are located. Did we miss something?
SIGN 2 Sta 439+50, 21.9 m Right of "SD-15R"
SIGN 4 Sta 446+35, 6.4 m Right of "NCFNOF" SIGN 9 Sta 452+70, 26.5 m Right of "SD-15R" SIGN V1 Sta 325+37, 4.0 & 31.0 m Left of "SD-15R", NB-15 SIGN V2 Sta 327+35, 4.9 & 33.0 m Left of "SD-15R", NB-15 SIGN V3 Sta 328+35, 4.2 m Left of "SD-15R", NB-15 SIGN V4 Sta 337+00, 3.3 & 26.5 m Left of "SD-15R", NB-15 SIGN V5 Sta 341+95, 2.9 & 26.6 m Left of "SD-15R", NB-15 SIGN V6 Sta 364+80, 3.3 m Left of "SD-15R", NB-15 SIGN V7 Sta 408+00, 3.3 m Left of "SD-15L", SB-15 SIGN V8 Sta 410+90, 3.3 m Left of "SD-15R", NB-15 SIGN R1 Sta 375+30, 5.7 & 40.0 m Left of "SD-15R", NB-15 SIGN R2 Sta 397+20, 3.0 & 26.7 m Left of "SD-15R", NB-15
SIGN R3 Sta 450+78, 5.2 m Right of "NCFNON", NB Off DAR to
NB-15
|
| 13 |
Plan
Sheet
/ Specification Reference=Item #91, Concrete Pavivement undowelled
Question=1. On Sheet 19,
L-8.
The paving leader line indicators do not match the cross sections along
I-15 Median from Sta 453+00 to 456+20 NB. No typical sections
either.
|
| 14 |
Plan
Sheet
/ Specification Reference=92 - Concrete Pavement (Rapid
Strength Concrete), Section 10-1.47 Question=1. What is the required thickness of the Rapid Strength Concrete?
contract unit price paid for tie bar....". Will there be a separate pay item for these tie bars or are they incidental to the Rapid Strength Concrete pay item?
|
|
15 Q:05/01/06 R:05/08/06 |
Plan Sheet / Specification
Reference=
27 - Maintain Temporary Fence (Type ESA) Special Provisions Section 10-1.30 Question=The special
provisions state
that existing temporary fence (type
|
|
16 Q:05/03/06 R:07/08/06 |
Plan Sheet / Specification
Reference=Bid
Item #152 Miscellaneous Iron & Steel Drainage System #6m (Drainage Qty. Sht. DQ-3) lists 34 kg. of Misc. I & S Question=This item is a
Concrete Headwall.
What does the 34 kg. consist
|
|
17
Q:05/05/06 R:05/08/06 |
Plan
Sheet
/ Specification Reference=
Question=There is a statewide
AGC Meeting
which occurs from May 16 thru 18 in Monterey. Is it possible to
postpone
this bid until the following week 5-25-06?
|
|
18
Q:05/09/06 R:05/12/06
|
Plan Sheet / Specification
Reference=Response
to the answer for Question #15. Question=I believe the ESA
fence shown
on L-1, L-2, and Q-4 is the New
|
19 Q:05/15/06 R:05/16/06 |
Plan
Sheet / Specification Reference=Bid Item #46 Bridge Removal (Portion),
Plan Sheets No. 530 and No. 556. Question=What are the actual limits of removals of the existing bridge rail per note #6 on Plan Sheet #530 and note #4 on plan sheet #556
|
|
20 Q:05/16/06 R:05/17/06
|
Plan Sheet / Specification
Reference=
Reinforced Elastomeric Bearing Pads 20mm x 100mm x 300mm and 20mm x 60mm x 150mm located on sheets 614 and 615 of 640 total sheets. Special Provision section 10-1.52 Concrete Structures / Elastomeric Bearing Pads. Question=Are the reinforced
elastomeric
bearing pads located in MSE walls The only reference given for
elastomeric
bearing pads in the special
|
21 Q:05/16/06 R:05/17/06 |
Plan
Sheet / Specification Reference=item 96 grind existing pccp, specials
section 10-1.49 grind pccp and plan sheet #309. Question=The specials state that the grinding of exisiting pccp "shall be performed in the longitudinal direction of the traveled way and shall be done full lane width so that the grinding begins and ends at lines perpendicular to the pavement centerline". The plans have a quantity sheet on page #309 that has a length and M2 which equalls a grind width of 2.13m (7ft). This is an odd width and does not match the directions given in the specials.
|
|
22 Q:05/16/06 R:05/17/06 |
Plan Sheet / Specification
Reference=Overhead
Signs, Metal Beam Guard Rail Concrete Barrier Type 60 series, various
items
and special provisions sections Question=The incomplete,
contradictory
and ambiguous contract plans and specifications for
overhead
sign, metal beam guard rail, concrete barrier type 60 series
required
for this project, render the requirements of Standard Specification
Section
2 including the June 19, 2003 amendments provided on page 17 and 18,
impossible
to comply with. Requirement of the second paragraph of amended 2-1.03
on
page 17 is meaningless in the submission of a bid for undefined
overhead
sign, metal beam guard rail, concrete barrier type 60 series work.
Confirm
that the second to the last paragraph of Section 1 on page 16 is the
definition
for bid pricing. Confirm that any contractor's interpretation for
pricing
is essentially meaningless because the overhead sign, metal beam guard
rail, concrete barrier type 60 series work is undefined and lacks
completeness
accuracy and detail to allow a contractor to determine
requirements
of that work. Confirm that until your design is complete the bid
prices are only a guide for determination of rank of bidders. Confirm
that
you will compensate the contractor for all efforts to assist you in
review
and preparation of final contract plans and specifications. Confirm
that
you are prepared to and will provide mutually acceptable contract
change
order(s) for the final, real contract requirements as the work is
defined
and before you demand it to be performed. Confirm that you are prepared
to and will provide staff to enable preparation of your final contract
design and details to assure that Section 4 including
incentive/disincentives
are not compromised.
|
23 Q:05/17/06 R:05/17/06 |
Plan