| CONTRACT NO: | 11-064844 |
| ROUTE / KP | 11-SD-15-M35.7/M39.2 |
| LOCATION | In San Diego County In San Diego At Various Locations From 0.5 Km North Of Camino Del Norte Undercrossing To Duenda Road Overcrossing.. |
| DESCRIPTION | Construct Sound Walls. |
| ESTIMATE | $ 3,550,000 |
| ADVERTISE DATE | 3/06/2006 |
| BID OPENING | 4/06/2006
5/18/2006 |
| FINAL POSTING | 05/17/06 @ 16:00 |
|
|
PETERSON CHASE GEN ENG. | $ 4,902,265.00 |
|
|
WEST COAST GENCORP | $ 4,948,387.80 |
|
|
FCI CONSTRUCTORS | $ 5,644,382.00 |
The Caltrans District
11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11
Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the
contract,
are not a part of the contract and are provided for the bidder's
convenience
only. In some instances, the question and answer may represent a
summary
of the matters discussed rather than a word-for-word recitation. The
responses
may be considered along with all other information furnished to
prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is
not
to be construed in any way as a waiver of the provisions of Section
2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements.
Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction
Department
has developed this method of answering Bidder's Inquiries to better
serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that
Contract,
but reserves the right to not answer any questions deemed
unsatisfactory
for public viewing.
The BIDDER'S
INQUIRIES
& RESPONSES will be updated continuously and all attempts will be
made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
| FONDATION REPORT |
|
|
|
|
ADDENDUM
|
|
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
1
Q:04/13/06
R:04/18/06
|
Plan Sheet / Specification
Reference=
Question=The pilasters are wider than the pile cap. Is it the intent that the pilasters overhang the pile cap and rest on soil?
|
|
2
Q:04/13/06
R:04/18X/06
|
Plan
Sheet
/ Specification Reference=
Question=The specifications
call for
splitface block to be used. Splitface one side or two sides?
|
|
3
Q:04/13/06
R:04/18/06
|
Plan
Sheet
/ Specification Reference=
Question=If the block is to be splitface one side, at the pilasters do you want the splitface on the inside of the pilaster adjacent to the non-splitface side of the wall so that the pilaster face on the back of the wall is smooth?
|
|
4
Q:04/13/06
R:04/18/06
|
Plan
Sheet
/ Specification Reference=
Question=The posts for the glass panels will need to be embedded into the block which conflicts with the bond beam. Please provide a detail to accommodate this situation.
|
|
5
Q:04/13/06
R:04/18/06
|
Plan
Sheet
/ Specification Reference=Plan sheet SW-27
Question=The note on plan sheet SW-27 states “EMBEDMENT FOR GLASS PANEL POSTS TO BE DETERMINED BY THE ENGINEER.” Does this refer to The Deputy Director Transportation Engineering or does it refer to the designer of the glass system? If it refers to the Caltrans Engineer, will the Engineer make that determination and provide details prior to the bid?
|
|
6
Q:04/13/06
R:04/18/06
|
Plan
Sheet
/ Specification Reference=Plan sheet SW-27
Question=The specifications
call for
glass panels with a 15 mm thickness. Glass is not manufactured in
metric
sizes. The two nearest standard glass sizes to 15 mm is ½” and
¾”.
All others would be special order. Please indicate what equivalent size
(in inches) Caltrans wants to match the 15 mm call-out.
|
|
7
Q:04/26/06
R:05/04/06
|
Plan
Sheet
/ Specification Reference= Item#28 Plan sheet SW-39
Question=Looking for soils
report and