| CONTRACT NO: | 11-236304 |
| ROUTE / KP | 11-SD-54-T19.6/T22.9 |
| LOCATION | In San Diego County From 0.2 Km West Of Brabham Street To 0.1 Km West Of Kendrick Way. |
| DESCRIPTION | Existing Highway Is To Be Overlaid With Rubberized Asphalt Concrete. |
| ESTIMATE | $ 1,850,000 |
| ADVERTISE DATE | 05/16/2005 |
| BID OPENING | 06/16/2005 |
| FINAL POSTING | 06/15/05 @ 16:30 |
|
|
HANSON SJH CONST | $1,299,358.00
|
|
|
DALEY | $1,454,016.00
|
|
|
HAZARD CONSTRUCTION CO | $1,593,879.00
|
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
|
|
|
|
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
Q: 05/23/05 R: 06/07/05 |
Plan Sheet / Specification Reference=For
line item 32 MINOR CONCRETE (minor structures), = Item 3 7 and item # 14
----Remove /Replace AC dike
Question=A significant amount of the existing AC dike to be removed and replace is adjacent to existing AC Sidewalk. This will necessitate asphalt patching between the new dike and existing sidewalk when the new dike is placed. Since there is no Misc. AC item to cover this work, and it canot by nature be considered backfill dike, how will the contractor be paid to perform this work.
|