| CONTRACT NO: | 11-235504 |
| ROUTE / KP | 11-Imp-86-69.7/109.1 |
| LOCATION | In Imperial County From San Felipe Creek Bridge To The Riverside County Line.. |
| DESCRIPTION | Existing Highway Cold Planed And Replaced With Asphalt Concrete. |
| ESTIMATE | $ 12,700,000 |
| ADVERTISE DATE | 05/16/2005 |
| BID OPENING | |
| FINAL POSTING | 07/06/05 @ 15:05 |
|
|
GRANITE CONSTRUCTION CO
A. $16,233,698 B. 117 DAYS |
$ 17,602,598.00 |
|
|
COFFMAN SPECIALTIES INC
A. $19,151,000 B. 120 DAYS |
$ 20,555,000.00 |
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
|
05/25/05 |
06/10/05 |
06/23/05 |
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry. |
|
Q: 06/17/05 |
Plan Sheet / Specification Reference=
25. Repair Spall Joints 26. Repair Longitudal Cracks.
Question=Per plans sheet C1, the widths of the repairs for bid items 25 and 26 are given; however, the depths are not. What is the depth of the repair ? Without this information, the amount of polyester concrete may not be deternined, and bid item is paid by M2.
|
|
Q: 06/20/05 R: 06/24/05 |
Plan Sheet / Specification Reference=
20. Rubberized Asphalt
Question=1. If the critical path of the project runs through the rubberized ac item, how long will it take Caltrans to complete test 375, and will contract time be extended while waiting for the test results?
|
|
Q: 06/20/05 |
Plan Sheet / Specification Reference=
16. Roadway Excavation
Question= Will Caltrans provide compaction test results on the 95 % subgrade requirement for the widening within the same day of it's completion?
|
|
Q: 06/20/05 |
Plan Sheet / Specification Reference=20.
Rubberized Asphalt
Question=1. Please provide the AC profile grades, per lane, both existing and proposed , so as to determine the milling depths that are required to meet the surface tolerance requirements.
|
|
Q: 06/24/05 R: 06/27/05 |
Plan Sheet / Specification Reference=
Item #24 rapid strength concrete Section 10-1.29 rapid strength concrete
Question= In the 1st paragraph it says that the pccp and the underlyingctb are to be removed and replaced. But the rest of the section mentions only removing and replacing the pccp. Please clarify.
|
|
Q: 06/27/05 |
Plan Sheet / Specification
Reference=Items 13-Cold Plane AC Pavement, 18--Asphaltic Emulsion (Fog
Seal), 19-Asphalt Concrete (Type A), and 20-Rubberized Asphalt Concrete
(Type G).
Question=Per Plans Sheets X-1 and X-2, Typical cross section show that the contractor will not do any work outside 1.5 meters on the median shoulder and no work outside 3.05 meters on the right shoulder (except for the widening sections @ Sta. 706+012.984 to Sta. 901+50.869) Is this correct?
|
|
Q: 06/28/05 |
Plan Sheet / Specification Reference=
Item 32, Transition Railing (Type WB, Q-1 10-1.37 Page 183
Question=What is the method of attachment where the WB transition railing attaches to existing metal bridge railing ( 2 different Types)
|
|
Q: 07/01/05 R: 07/05/05 |
Plan Sheet / Specification Reference=
Previous Pre Bid Inquiry and Response # 7
Question=Ref previous Pre-Bid Inquiry # 7 and your response dated 7/01/05- This response is ambiguous, non-responsive and inappropriate. Suggest that the Department comply with your public contract requirement to "provide complete accurate plans and specifications" by issuing details, specifications bid items and refrence stanard plans to define, to all bidders, what your scope and method of compensation is. The "... bid per contract documents." answer is unacceptable.
|