| CONTRACT NO: | 11-235704 |
| ROUTE / KP | 11-SD-8-12.1 |
| LOCATION | In San Diego County In San Diego 0.7 km East Of Waring Road Overcrossing. |
| DESCRIPTION | Reconstruction Of Earth Retaining System. |
| ESTIMATE | $ 540,000.00 |
| ADVERTISE DATE | 03/24/03 |
| BID OPENING | |
| FINAL POSTING | 05/07/03 @ 15:00 |
|
|
ELKEN CONTRACTING, CIN. | $ 381,672.00 |
|
|
ERRECA'S/HANSON SJH | $ 418,626.00 |
|
|
CBR ENGINEERING CONTRACTOR | $438,673.00 |
The Caltrans District 11 Office is located at 2829
Juan Street, San Diego, CA 92110. The mailing address is P.O. Box 85406,
San Diego, CA 92186-5406. The District 11 Duty Senior telephone number
is (619) 688-6635. Please submit all inquiries in the proper format by
fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to bidder' inquiries,
unless incorporated into a formal addenda to the contract, are not a part
of the contract and are provided for the bidder's convenience only. In
some instances, the question and answer may represent a summary of the
matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department has
developed this method of answering Bidder's Inquiries to better serve the
needs of the Contractors who bid on our Projects. Caltrans District 11
Construction Department will post all of the questions submitted by any
of the contractors that are registered Planholders for that Contract, but
reserves the right to not answer any questions deemed unsatisfactory for
public viewing.
The BIDDER'S INQUIRIES &
RESPONSES will be updated continuously and all attempts will be made to
do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
|
04/15/03 |
04/25/03 |
|
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
Q:03/26/03 R:03/26/03 R:04/04/03 |
Plan Sheet /
Specification Reference=Section 2-1.03 of the Special Provisions paragraph
8
Will cross sections be available to the bidders?
|
|
Q:04/09/03 R:04/15/03 |
Plan Sheet /
Specification Reference=Item 13: Recon Earth Retain. System
Plan sheets # L-1,C-1,Q-1
Layout sheet shows limit 162+80 to 163+59, Q-1 states it at 162+86 to 163+77, which is correct?
|
|
Q:04/09/03 R:04/15/03 |
Plan Sheet /
Specification Reference=Item 13: Recon Earth Retain. System
Plan sheets # L-1,C-1,Q-1
Layout sheet shows 14 posts, quantity sheet shows 54 posts, which is correct?
|
|
Q:04/09/03 R:04/15/03 |
Plan Sheet /
Specification Reference=Item 13: Recon Earth Retain. System
Plan sheets # L-1,C-1,Q-1
C-1 says to use a 3.6 m post, if so it will have to be deeper than 1.5 m in the ground, please clarify.
|
|
Q:04/09/03 R:04/15/03 |
Plan Sheet /
Specification Reference=Item 20. Replace AC surfacing. Plan
sheets # X-1, L-1, Q-1
In item 20 it includes providing AC, therfore the AC item should only be for the Dike, if so the quantity is grossly overstated. Please clarify.
|
|
|
|
|
|
|