| CONTRACT NO: | 11-199364 |
| ROUTE / KP | 11-IMP-111-R28.2/R35.6 |
| LOCATION | In Imperial County In And Near Brawley From 0.1 km South Of Worthington Road To 0.4 km North Of Route 78. |
| DESCRIPTION | Construct A 4-lane Divided Highway And Two Bridge Structures. |
| ESTIMATE | $ 17,597,000.00 |
| ADVERTISE DATE | 03/24/03 |
| BID OPENING | 05/08/03 |
| LAST POSTING | 05/07/03 @ 15:00 |
|
|
GRANITE CONSTRUCTION COMPANY | $ 12,307,614.00 |
|
|
KIEWIT PACIFIC CO. | $ 13,386,767.00 |
|
|
VANCE CORPORATION | $ 13,457,154.00 |
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
|
|
|
|
|
04/23/03 |
|
|
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
Q:03/26/03 R:03/26/03 |
Plan Sheet /
Specification Reference=NOTICE TO CONTRACTORS
When will the cross sections be available and where?
5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to plot@mesablueprint.com San Diego, CA 92123 |
|
Q:03/28/03 R:04/16/03 |
Plan Sheet / Specification Reference=Item
# 93 Traffic Striping and Plan Sheet PD-18 (137 of 191)
The main line N/B & S/B is constructed edge to edge with PCC, with no AC shoulders. Are the quantities shown for Details 25 and 27B to include the black shadow stripe? Is the width 100 mm?
|
|
Q:04/30/03 R:05/07/03 |
Plan Sheet / Specification Reference=Item
# 89
For item number 89, which is a final pay item, there is no stationing to quantify the length in meters of the concrete barrier (type 732). Could you please provide us with stations to verify the length of the concrete barrier.
From the Abutment Details, the wing wall starts at the joint or 0.15 meters in from BB and also from EB. From the Abutment Layout, the wing walls are 5.50 m long. For one side of a
bridge: 11.955 - 0.15(2) + 5.5(2) = 22.655
|
|
Q:05/02/03 R:05/06/03 |
Plan Sheet / Specification Reference=Item
#49, Concrete Pavement, Special Provision Section 10-1.39 MATERIALS - Subsection
CONCRETE
On page 150 of the Specifications, "The concrete shall contain a minimum of 350 kg of portland cement per cubic meter." Should this be 350 kg of cementitious material per cubic meter?
|
|
Q:05/02/03 R:05/07/03 |
Plan Sheet / Specification Reference=special
provision section 10-1.48 reinforced concrete pipe
Paragraph 8 starts w/ Except for drainage
units shown on the plans as RCP(class III etc .
.
|