| CONTRACT NO: | 11-080904 |
| ROUTE / KP | 11-SD-15,56-M30.6/M35.4,14.4/15.1 |
| LOCATION | In San Diego County In San Diego On Rte 15 From 0.9 KM South Of Rte 15/56 Separation Overcrossing To 0.1 KM North Of Camino Del Norte Undercrossing And On Rte 56 From 0.4 KM West Of Rte 56/15 Separation To 0.4 KM East Of Rte 15. |
| DESCRIPTION | Construct Managed Lanes Middle Stage 1. |
| ESTIMATE | $ 57,509,000.00 |
| DESIGN SEQUENCING PROJECT | |
| ADVERTISE DATE | 07/21/03 |
| BID OPENING | 09/18/03 |
| FINAL POSTING | 09/17/03 @ 17:00 |
|
|
COFFMAN SPECIALTIES INC. | $ 51,544,999.50 |
|
|
FCI CONSTRUCTORS BALFOUR BEATTY A JOINT VENTURE | $ 54,223,539.00 |
|
|
SEMA CONSTRUCTION INC. | $ 55,666,228.84 |
| 4 | YEAGER SHANSKA INC. | $ 57,612,160.00 |
The Caltrans District 11
Office is located at 2829 Juan Street, San Diego, CA 92110. The mailing
address is P.O. Box 85406, San Diego, CA 92186-5406. The District 11 Duty
Senior telephone number is (619) 688-6635. Please submit all inquiries
in the proper format by fax to (619) 688-6988 or e-mail to:
Duty_Senior_Const_District11@dot.ca.gov.
The responses to
bidder' inquiries, unless incorporated into a formal addenda to the contract,
are not a part of the contract and are provided for the bidder's convenience
only. In some instances, the question and answer may represent a summary
of the matters discussed rather than a word-for-word recitation. The responses
may be considered along with all other information furnished to prospective
bidders for the purpose of bidding on the project. The availability or
use of information provided in the responses to bidder' inquiries is not
to be construed in any way as a waiver of the provisions of Section 2-1.03
of the Standard Specifications or any other provision of the contract,
the plans, Standard Specifications or Special Provisions, nor to excuse
the contractor from full compliance with those contract requirements. Bidders
are cautioned that subsequent responses or contract addenda may affect
or vary a response previously given.
Caltrans District 11 Construction Department
has developed this method of answering Bidder's Inquiries to better serve
the needs of the Contractors who bid on our Projects. Caltrans District
11 Construction Department will post all of the questions submitted by
any of the contractors that are registered Planholders for that Contract,
but reserves the right to not answer any questions deemed unsatisfactory
for public viewing.
The BIDDER'S INQUIRIES
& RESPONSES will be updated continuously and all attempts will be made
to do the final posting by 15:00 on Wednesday prior to the bid opening.
INFORMATION
AVAILABLE
|
|
|
|
|
|
|
|
|
|||
|
|
|
09/02/03 |
09/04/03 |
|
BIDDER'S
INQUIRY SUBMITTAL FORM
|
|
Inquiry |
|
Q:07/28/03 |
Plan Sheet /
Specification Reference=NOTICE TO CONTRACTORS
When will the cross sections be available and where?
5560 Ruffin Road Suite 5 San Diego, CA 92123 (858) 541-1500 FAX (858) 278-0558 e-mail to plot@mesablueprint.com San Diego, CA 92123 |
|
Q:08/07/03 |
Plan Sheet /
Specification Reference=Retaining Wall "331R" - shown on sheets 563 &
564 typical section on 563. Retaining Wall "361L1" - shown on sheets
615 thru 618 - Typical section shown on 615.
Is ditch behind wall "361L1" a type
A or B concrete channel as shown on sheet 349. Retaining wall quantities
shown on sheet 533 do not include quantities for walls "331R" and "361L1"
- What are the quantities? Will this change the bid quantity? Where
is colored ditch lining shown on drawings (Bid item # 186)?
|
|
Q:08/11/03 |
Plan Sheet /
Specification Reference= Items 24, 28, 29, 50, 200, 230, 209, 210, 211,
212, 213, 214, 215.
Metal Beam Guardrail is not shown on
the layout sheets. please provide new layout drawing and/or stationing.
|
|
Q:08/12/03 R:08/14/03 |
Plan Sheet /
Specification Reference= Sheet 533 of 972, Retaining Wall Quantities Table
refers to RW 317L.
Where are the plan sheets for this retaining wall?
|
|
Q:08/13/03 R:08/29/03 |
Plan Sheet /
Specification Reference= Sheets 881,882
These two sheets do not seem to coincide with the other sheets for this structure (Carmel Mountain Road OC). Can you please supply the correct general plan sheets 1 and 2 for this structure showing the plan view and typical sections for stages 1 and 2 that match the rest of the plans. Without these sheets, we cannot determine the correct staging and removal sequence among other important details. I understand that this is a design sequencing project. Regardless, I would expect even preliminary design plans to include proper general plan sheets. It appears as though the current sheets 881, and 882 were earlier design concepts for this structure because they only show two parallel superstructures rather than the three bridge design shown in subsequent sheets. The revision dates at the lower right of these two sheets seem to support this conclusion. Given that general plan sheet three (sheet 883)shows the correct section, as do all the other sheets I would hope that the correct versions of the first two sheets are also available. Additionally, please clarify which set of quantities are correct for this structure. I assume that those on sheet 884 are correct not those shown on sheet 881.
|
|
Q:08/13/03 R:08/21/03 |
Plan Sheet /
Specification Reference= Plan Sheets 574,575
These two plan sheets refer to a portion of Wall "335L" which is shown in the structure plans. The structure plans do not show this portion of the wall. Will the design of this portion of the wall be available before bid, or is this a part of the future design sequence? Do the bid quantities for this wall on sheet 533 include amounts for this portion of this wall? If so, what design has been assumed to calculate those quantities?
|
|
Q:08/14/03 R:08/21/03 |
Plan Sheet /
Specification Reference=
1. Where can I find layout and elevation
for R.W. 317L?
|
|
Q:08/14/03 |
Plan Sheet /
Specification Reference=
Plan sheets #745, 746,747, 765, 766, 767, 768, 769, 770, of the electrical portion are blank, Are these to remain blank or is an addendum to follow correcting this? This impacts bid items 241, 243, 244, 245.
|
|
Q:08/18/03 R:08/28/03 |
Plan Sheet /
Specification Reference=Retaining wall quantities- sheet 533. Bid
item #186-colored ditch lining.
Ditch lining quantities for retaining
walls 331R & 361L1 are not shown on sheet 533-
|
|
Q:08/25/03 |
Plan Sheet /
Specification Reference=Item 121 Structural Concrete Bridge at Carmel Mtn.
Final Pay Qty of 4,000 M3
Plan Sheet 881 shows quantity for Bridge is 3,300 M3 Plan Sheet 884 shows quantity for Bridge is 4,000 M3 If you replace sheet 881 per question #5 then you would use the quantity of 4,000 M3 from sheet 884. However the quantity given on sheet 881 is actually closer to our take off. It seems there is some confusion on this bridge as to what is to be built and what quantities are correct. As this is a final pay item, it must be cleared up and time given to complete a reasonable take off in order to establish a fair unit price.
|
|
Q:08/27/03 |
Plan Sheet /
Specification Reference=
Due to a heavy bidding schedule, we may not be able to submit a proposal for the project in reference unless the bid date is postponed. Accordingly, we are respectively requesting the bid to be postponed by at least 2 weeks.
|
|
Q:09/03/03 |
Plan Sheet /
Specification Reference=59 Roadway Excavation
Typical cross-sections would indicate
that portions of the
|
|
Q:09/10/03 |
Plan Sheet /
Specification Reference=
Specification Section 10-1.01 - ORDER
OF WORK, paragraph 6 states that
We are having a difficult time understanding
what is trying to be achieved
1: We are interpreting a
location to be defined by a specific lane
2: Is the reference to "sand
blasting" meant to be for all sand
|
|
Q:09/11/03 |
Plan Sheet /
Specification Reference=Plan sheets 381-384
Station lines SD-15R and SD-15L are
not shown on the staging
|
|
Q:09/11/03 |
Plan Sheet /
Specification Reference=Bid item 118, Structure Concrete Bridge
Footing, sheet 850 of 972 Bid item 112, 600MM Cast-In-Drilled-Hole
Concrete Piling, sheet 850 of 972
The work area described in section A-A
is 4.9 meters wide. The footing to
Is the stage construction plan going
to be modified to provide sufficient
|
|
Q:09/11/03 |
Plan Sheet /
Specification Reference=
Plans show 36-20A pole to be new or relocated. Standard Plans (CT '99) shows either slip base or non slip base to be designated on plans. This is not shown on plan. Does the State want all slip bases? Sheet 738 & 740 has a Note 3 with
no legend.
|
|
Q:09/12/03 |
Plan Sheet /
Specification Reference=#188 Minor Concrete(Curb,Gutter,SW,DW)
#189 Minor Concrete (Textured Paving) (Gore Paving) The bid quantity for #188 shows 280 m3, while the summary of quanity sheet Q-9 show 20.8 m3. Which is correct and will the correct quatity be shown in a revised addendum? For bid item #189 the summary of quantity sheet Q-9 shows 678 m2 for gore #2 on sheets L-6 & C-4 detail. This quantity does not reflect the calcuation of m2 based on the dimensions shown on C-1. Will this be correct prior to bid date?
|
|
Q:09/15/03 |
Plan Sheet /
Specification Reference=specials page 109 sec. 10-1.01 Order of Work 6th
paragraph.
Please define location. Does this spec limit any combination of the 5 stationary work items to be performed within 21 day period? For example; if there were 5 days of falsework erection and 5 days of bridge demolition within the 21 period.
|
|
Q:09/16/03 |
Plan Sheet /
Specification Reference=STAGE 1A, CONTRACT PLAN PAGE #381 & # 388 ;TYPICAL
SECTION PLAN PAGE # 12.
AT CARMEL MOUNTAIN ROAD OC, STAGE 1A CONSTRUCTION, ITEM 3 SPECIFIES THAT THE NB OUTSIDE WIDENING BE CONSTRUCTED. BASED ON THE TYPICAL SECTION AND THE BRIDGE GENERAL PLAN, THE NB EDGE OF SHOULDER IS WITHIN 1 METER +/- OF THE EXISTING ABUTMENT 3 AND WILL REQUIRE THE REMOVAL OF THE EXISTING SLOPE TO MAINTAIN THE NORTH BOUND OUTSIDE WIDENING. SINCE CARMEL MOUNTAIN OC IS PART OF THE DESIGN SEQUENCING, THE PLANS ARE INCOMPLETE RELATIVE TO SHORING UP THE EXISTING STRUCTURE. PLEASE VERIFY THAT THIS WILL BE ADDRESSED AS PART OF THE DESIGN SEQUENCING OR PROVIDE THE SHORING CRITERIA TO SUPPORT THE EXISTING STRUCTURE.
|
|
Q:09/16/03 |
Plan Sheet /
Specification Reference=traffic charts
Which traffic charts are to be used
for the bridge demolition at the three locations?
2) Carmel Mountain Rd. Overcrossing, charts 3 and 4. 3) Camino del Norte Undercrossing, charts 21 and 23.
|