LA710                                  Status of Closure:      __   =  Cancelled

Dir

Date/Time

Begin & EndLimit

Type

Lanes Closed

Total Lanes

Description

Start         End
               
NB 05/27/2008   07:00PM 05/28/2008   05:00AM Alondra Blvd Mainline #1 5 Shoulder Reconstruction,
Rosecrans Ave
SB 05/27/2008   07:00PM 05/28/2008   05:00AM SB Long Beach Frwy Connector All 2 Bridge Work,Slab Replacement,
WB Artesia Frwy, Rte 91
NB 05/27/2008   07:00PM 05/28/2008   06:00AM NB Long Beach Frwy Connector All 2 Bridge Work,Slab Replacement,
WB Artesia Frwy, Rte 91
NB 05/27/2008   07:00PM 05/28/2008   06:00AM Long Beach Blvd Mainline #1 5 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/27/2008   07:00PM 05/28/2008   06:00AM WB Imperial Hwy Mainline #2,#3,#4 4 Shoulder Reconstruction,
SB Long Beach Frwy
SB 05/27/2008   07:00PM 05/28/2008   06:00AM SB Long Beach Frwy Connector All 2 Sign Installation,
EB San Bernardino Frwy, Rte 10
SB 05/27/2008   07:00PM 05/28/2008   06:00AM SB Long Beach Frwy Connector All 2 Sign Installation,
EB San Bernardino Frwy, Rte 10
SB 05/27/2008   07:00PM 05/28/2008   06:00AM SB Long Beach Frwy Connector All 2 Sign Installation,
WB San Bernardino Frwy, Rte 10
SB 05/27/2008   07:00PM 05/28/2008   06:00AM Alondra Blvd Mainline #1 5 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/27/2008   07:00PM 05/28/2008   06:00AM Rosecrans Ave Mainline #1 5 Shoulder Reconstruction,
Alondra Blvd
SB 05/27/2008   07:00PM 05/28/2008   06:00AM SB Long Beach Frwy Off-Ramp All 1 Shoulder Reconstruction,
E&W Century Frwy, Rte 105
SB 05/27/2008   07:00PM 05/28/2008   06:00AM SB Long Beach Frwy Off-Ramp All 1 Shoulder Reconstruction,
Martin Luther King Jr. Blvd
SB 05/27/2008   07:00PM 05/28/2008   06:00AM SB Long Beach Frwy Off-Ramp All 1 Shoulder Reconstruction,
Rosecrans Ave
SB 05/27/2008   07:00PM 05/28/2008   06:00AM WB Imperial Hwy On-Ramp All 1 Shoulder Reconstruction,
SB Long Beach Frwy
SB 05/27/2008   07:00PM 05/28/2008   06:00AM WB Imperial Hwy On-Ramp All 1 Shoulder Reconstruction,
SB Long Beach Frwy
SB 05/27/2008   07:01PM 05/28/2008   06:00AM SB Long Beach Frwy Off-Ramp All 1 Sign Installation,
E&W Floral Dr
SB 05/27/2008   08:00AM 05/28/2008   05:00AM Long Beach Blvd Mainline #1 4 Shoulder Reconstruction,
Del Amo Blvd
NB 05/27/2008   08:00PM 05/28/2008   05:00AM NB Long Beach Frwy Connector All 2 Drainage Work,
WB Century Frwy, Rte 105
SB 05/27/2008   08:00PM 05/28/2008   05:00AM Del Amo Blvd Mainline #1 4 Shoulder Reconstruction,
San Diego Frwy, Rte 405
SB 05/27/2008   08:00PM 05/28/2008   05:00AM Alondra Blvd Mainline #1,#2 5 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/27/2008   08:00PM 05/28/2008   05:00AM Rosecrans Ave Mainline #1,#2 5 Shoulder Reconstruction,
Alondra Blvd
SB 05/27/2008   08:00PM 05/28/2008   05:00AM Martin Luther King Jr. Blvd On-Ramp All 1 Shoulder Reconstruction,
SB Long Beach Frwy
NB 05/27/2008   08:00PM 05/28/2008   06:00AM NB Long Beach Frwy Connector All 2 Pavement Rehabilitation,Slab Replacement,
EB Artesia Frwy, Rte 91
NB 05/27/2008   08:00PM 05/28/2008   06:00AM Del Amo Blvd Mainline #1 4 Shoulder Reconstruction,
Long Beach Blvd
NB 05/27/2008   08:00PM 05/28/2008   06:00AM San Diego Frwy, Rte 405 Mainline #1 4 Shoulder Reconstruction,
Del Amo Blvd
NB 05/27/2008   08:00PM 05/28/2008   06:00AM Long Beach Blvd Mainline #1,#2 5 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/27/2008   08:00PM 05/28/2008   06:00AM SB Long Beach Frwy Connector All 2 Sign Installation,
E&W Pomona Frwy, Rte 60
SB 05/27/2008   08:00PM 05/28/2008   06:00AM Valley Blvd Mainline #1 3 Sign Installation,
Cesar Chavez Ave
SB 05/27/2008   08:01PM 05/28/2008   06:00AM Valley Blvd Mainline #3 3 Sign Installation,
Cesar Chavez Ave
N&S 05/27/2008   09:00AM 05/27/2008   01:00PM N&S Pico Ave HOV #1 4 Sweeping Operation (Moving Closure),
N&S Imperial Hwy
SB 05/27/2008   09:00AM 05/27/2008   02:00PM EB Pacific Coast Hwy, Rte 1 On-Ramp All 1 Landscaping,
SB Long Beach Frwy
SB 05/27/2008   09:00PM 05/28/2008   05:00AM Firestone Blvd Mainline #1 4 Shoulder Reconstruction,
Imperial Hwy
SB 05/27/2008   09:00PM 05/28/2008   05:00AM Imperial Hwy Mainline #1 4 Shoulder Reconstruction,
Rosecrans Ave
SB 05/27/2008   09:00PM 05/28/2008   05:00AM Imperial Hwy Mainline #4 4 Shoulder Reconstruction,
Century Frwy, Rte 105
SB 05/27/2008   09:00PM 05/28/2008   06:00AM SB Long Beach Frwy Connector All 2 Pavement Rehabilitation,Slab Replacement,
EB Artesia Frwy, Rte 91
NB 05/27/2008   10:00PM 05/28/2008   05:00AM NB Wardlow Rd Collector All 1 Guardrail Repair,
NB Long Beach Frwy
NB 05/27/2008   10:00PM 05/28/2008   05:00AM Long Beach Blvd Mainline #1 3 Shoulder Reconstruction,
Artesia Frwy, Rte 91
NB 05/27/2008   10:00PM 05/28/2008   05:00AM Wardlow Rd Mainline #1 3 Shoulder Reconstruction,
San Diego Frwy, Rte 405
NB 05/27/2008   10:00PM 05/28/2008   05:00AM Century Frwy, Rte 105 Mainline #1 4 Shoulder Reconstruction,
Imperial Hwy
NB 05/27/2008   10:00PM 05/28/2008   05:00AM Imperial Hwy Mainline #1 4 Shoulder Reconstruction,
Firestone Blvd
NB 05/27/2008   10:00PM 05/28/2008   05:00AM Rosecrans Ave Mainline #1 4 Shoulder Reconstruction,
Century Frwy, Rte 105
NB 05/27/2008   10:00PM 05/28/2008   05:00AM Del Amo Blvd Mainline #1,#2 4 Shoulder Reconstruction,
Long Beach Blvd
NB 05/27/2008   10:00PM 05/28/2008   05:00AM San Diego Frwy, Rte 405 Mainline #1,#2 4 Shoulder Reconstruction,
Del Amo Blvd
NB 05/27/2008   10:00PM 05/28/2008   05:00AM Alondra Blvd Mainline #1,#2 5 Shoulder Reconstruction,
Rosecrans Ave
SB 05/27/2008   10:00PM 05/28/2008   05:00AM EB Imperial Hwy On-Ramp All 1 Shoulder Reconstruction,
SB Long Beach Frwy
SB 05/27/2008   10:00PM 05/28/2008   05:00AM EB Imperial Hwy On-Ramp #2,#3,#4 4 Shoulder Reconstruction,
SB Long Beach Frwy
SB 05/27/2008   10:00PM 05/28/2008   05:00AM Artesia Frwy, Rte 91 Mainline #1 3 Shoulder Reconstruction,
Long Beach Blvd
SB 05/27/2008   10:00PM 05/28/2008   05:00AM San Diego Frwy, Rte 405 Mainline #1 3 Shoulder Reconstruction,
Wardlow Rd
SB 05/27/2008   10:00PM 05/28/2008   05:00AM Del Amo Blvd Mainline #1,#2 4 Shoulder Reconstruction,
San Diego Frwy, Rte 405
SB 05/27/2008   10:00PM 05/28/2008   05:00AM Long Beach Blvd Mainline #1,#2 4 Shoulder Reconstruction,
Del Amo Blvd
SB 05/27/2008   10:00PM 05/28/2008   05:00AM Rosecrans Ave Mainline #1,#2,#3 5 Shoulder Reconstruction,
Alondra Blvd
SB 05/27/2008   10:00PM 05/28/2008   05:00AM SB Long Beach Frwy On-Ramp All 1 Shoulder Reconstruction,
Martin Luther King Jr. Blvd
SB 05/27/2008   10:00PM 05/28/2008   05:00AM EB Imperial Hwy On-Ramp All 2 Shoulder Reconstruction,
SB Long Beach Frwy
SB 05/27/2008   10:00PM 05/28/2008   05:00AM EB Imperial Hwy On-Ramp All 2 Shoulder Reconstruction,
SB Long Beach Frwy
NB 05/27/2008   10:00PM 05/28/2008   06:00AM Cesar Chavez Ave Mainline #1 3 Sign Installation,
Valley Blvd
SB 05/27/2008   10:00PM 05/28/2008   06:00AM Alondra Blvd Mainline #1 3 Shoulder Reconstruction,
Artesia Frwy, Rte 91
NB 05/27/2008   11:00PM 05/28/2008   05:00AM Artesia Frwy, Rte 91 Mainline #1 3 Shoulder Reconstruction,
Alondra Blvd
NB 05/27/2008   11:00PM 05/28/2008   05:00AM Century Frwy, Rte 105 Mainline #1,#2 4 Shoulder Reconstruction,
Imperial Hwy
NB 05/27/2008   11:00PM 05/28/2008   05:00AM Imperial Hwy Mainline #1,#2 4 Shoulder Reconstruction,
Firestone Blvd
NB 05/27/2008   11:00PM 05/28/2008   05:00AM Rosecrans Ave Mainline #1,#2 4 Shoulder Reconstruction,
Century Frwy, Rte 105
NB 05/27/2008   11:00PM 05/28/2008   05:00AM Alondra Blvd Mainline #1,#2,#3 5 Shoulder Reconstruction,
Rosecrans Ave
NB 05/27/2008   11:00PM 05/28/2008   05:00AM Pacific Coast Hwy, Rte 1 Mainline #3 3 K-rail Removal,
Willow St
SB 05/27/2008   11:00PM 05/28/2008   05:00AM Imperial Hwy Mainline #1,#2 4 Shoulder Reconstruction,
Rosecrans Ave
SB 05/27/2008   11:00PM 05/28/2008   05:00AM Imperial Hwy Mainline #3,#4 4 Shoulder Reconstruction,
Century Frwy, Rte 105
SB 05/27/2008   11:00PM 05/28/2008   05:00AM SB Long Beach Frwy Off-Ramp All 1 Shoulder Reconstruction,
E&W Century Frwy, Rte 105
SB 05/27/2008   11:01PM 05/28/2008   05:00AM Valley Blvd Mainline #1,#2 3 Sign Installation,
Cesar Chavez Ave
SB 05/27/2008   11:01PM 05/28/2008   05:00AM Valley Blvd Mainline #2,#3 3 Sign Installation,
Cesar Chavez Ave
SB 05/27/2008   11:59AM 05/28/2008   04:00AM Imperial Hwy Mainline #1,#2,#3 4 Shoulder Reconstruction,
Firestone Blvd
NB 05/27/2008   11:59PM 05/28/2008   04:00AM Artesia Frwy, Rte 91 Mainline #1,#2 3 Shoulder Reconstruction,
Alondra Blvd
SB 05/27/2008   11:59PM 05/28/2008   04:00AM EB Imperial Hwy Mainline All 4 Shoulder Reconstruction,
SB Martin Luther King Jr. Blvd
SB 05/27/2008   11:59PM 05/28/2008   04:00AM Alondra Blvd Mainline #1,#2 3 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/27/2008   11:59PM 05/28/2008   04:00AM Artesia Frwy, Rte 91 Mainline #1,#2 3 Shoulder Reconstruction,
Long Beach Blvd
SB 05/27/2008   11:59PM 05/28/2008   04:00AM San Diego Frwy, Rte 405 Mainline #1,#2 3 Shoulder Reconstruction,
Wardlow Rd
SB 05/27/2008   11:59PM 05/28/2008   04:00AM Del Amo Blvd Mainline #1,#2,#3 4 Shoulder Reconstruction,
San Diego Frwy, Rte 405
SB 05/27/2008   11:59PM 05/28/2008   04:00AM Imperial Hwy Mainline #1,#2,#3 4 Shoulder Reconstruction,
Rosecrans Ave
SB 05/27/2008   11:59PM 05/28/2008   04:00AM Long Beach Blvd Mainline #1,#2,#3 4 Shoulder Reconstruction,
Del Amo Blvd
SB 05/27/2008   11:59PM 05/28/2008   04:00AM Imperial Hwy Mainline #2,#3,#4 4 Shoulder Reconstruction,
Century Frwy, Rte 105
NB 05/27/2008   11:59PM 05/28/2008   05:00AM Long Beach Blvd Mainline #1,#2 3 Shoulder Reconstruction,
Artesia Frwy, Rte 91
NB 05/27/2008   11:59PM 05/28/2008   05:00AM Wardlow Rd Mainline #1,#2 3 Shoulder Reconstruction,
San Diego Frwy, Rte 405
NB 05/27/2008   11:59PM 05/28/2008   05:00AM Rosecrans Ave Mainline #1,#2,#3 4 Shoulder Reconstruction,
Century Frwy, Rte 105
NB 05/27/2008   11:59PM 05/28/2008   05:00AM San Diego Frwy, Rte 405 Mainline #1,#2,#3 4 Shoulder Reconstruction,
Del Amo Blvd
NB 05/28/2008   01:00AM 05/28/2008   04:00AM Century Frwy, Rte 105 Mainline #1,#2,#3 4 Shoulder Reconstruction,
Imperial Hwy
NB 05/28/2008   01:00AM 05/28/2008   04:00AM Imperial Hwy Mainline #1,#2,#3 4 Shoulder Reconstruction,
Firestone Blvd
SB 05/28/2008   07:00PM 05/29/2008   05:00AM SB Long Beach Frwy Connector All 2 Bridge Work,Slab Replacement,
WB Artesia Frwy, Rte 91
NB 05/28/2008   07:00PM 05/29/2008   06:00AM NB Long Beach Frwy Connector All 2 Bridge Work,Slab Replacement,
WB Artesia Frwy, Rte 91
NB 05/28/2008   07:00PM 05/29/2008   06:00AM Long Beach Blvd Mainline #1 5 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/28/2008   07:00PM 05/29/2008   06:00AM SB Long Beach Frwy Connector All 2 Sign Installation,
EB San Bernardino Frwy, Rte 10
SB 05/28/2008   07:00PM 05/29/2008   06:00AM SB Long Beach Frwy Connector All 2 Sign Installation,
WB San Bernardino Frwy, Rte 10
SB 05/28/2008   07:00PM 05/29/2008   06:00AM Alondra Blvd Mainline #1 5 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/28/2008   07:00PM 05/29/2008   06:00AM Rosecrans Ave Mainline #1 5 Shoulder Reconstruction,
Alondra Blvd
SB 05/28/2008   07:01PM 05/29/2008   06:00AM SB Long Beach Frwy Off-Ramp All 1 Sign Installation,
E&W Floral Dr
SB 05/28/2008   08:00AM 05/29/2008   05:00AM Long Beach Blvd Mainline #1 4 Shoulder Reconstruction,
Del Amo Blvd
NB 05/28/2008   08:00PM 05/29/2008   05:00AM NB Long Beach Frwy Connector All 2 Drainage Work,
WB Century Frwy, Rte 105
SB 05/28/2008   08:00PM 05/29/2008   05:00AM Del Amo Blvd Mainline #1 4 Shoulder Reconstruction,
San Diego Frwy, Rte 405
SB 05/28/2008   08:00PM 05/29/2008   05:00AM Alondra Blvd Mainline #1,#2 5 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/28/2008   08:00PM 05/29/2008   05:00AM Rosecrans Ave Mainline #1,#2 5 Shoulder Reconstruction,
Alondra Blvd
SB 05/28/2008   08:00PM 05/29/2008   05:00AM Martin Luther King Jr. Blvd On-Ramp All 1 Shoulder Reconstruction,
SB Long Beach Frwy
NB 05/28/2008   08:00PM 05/29/2008   06:00AM NB Long Beach Frwy Connector All 2 Pavement Rehabilitation,Slab Replacement,
EB Artesia Frwy, Rte 91
NB 05/28/2008   08:00PM 05/29/2008   06:00AM Del Amo Blvd Mainline #1 4 Shoulder Reconstruction,
Long Beach Blvd
NB 05/28/2008   08:00PM 05/29/2008   06:00AM San Diego Frwy, Rte 405 Mainline #1 4 Shoulder Reconstruction,
Del Amo Blvd
NB 05/28/2008   08:00PM 05/29/2008   06:00AM Long Beach Blvd Mainline #1,#2 5 Shoulder Reconstruction,
Artesia Frwy, Rte 91
SB 05/28/2008   08:00PM 05/29/2008   06:00AM SB Long Beach Frwy Connector All 2 Sign Installation,
E&W Pomona Frwy, Rte 60
SB 05/28/2008   08:00PM 05/29/2008   06:00AM Valley Blvd Mainline #1 3 Sign Installation,
Cesar Chavez Ave
SB 05/28/2008   08:01PM 05/29/2008   06:00AM Valley Blvd Mainline #3 3 Sign Installation,
Cesar Chavez Ave
SB 05/28/2008   09:00PM 05/29/2008   05:00AM Firestone Blvd Mainline #1 4 Shoulder Reconstruction,
Imperial Hwy
SB 05/28/2008   09:00PM 05/29/2008   05:00AM Imperial Hwy Mainline #1 4 Shoulder Reconstruction,
Rosecrans Ave
SB 05/28/2008   09:00PM 05/29/2008   06:00AM SB Long Beach Frwy Connector All 2 Pavement Rehabilitation,Slab Replacement,
EB Artesia Frwy, Rte 91
NB 05/28/2008   10:00PM 05/29/2008   05:00AM Long Beach Blvd Mainline #1 3 Shoulder Reconstruction,
Artesia Frwy, Rte 91
NB 05/28/2008   10:00PM 05/29/2008   05:00AM Wardlow Rd Mainline #1 3 Shoulder Reconstruction,
San Diego Frwy, Rte 405
NB 05/28/2008   10:00PM 05/29/2008   05:00AM Century Frwy, Rte 105 Mainline #1 4 Shoulder Reconstruction,
Imperial Hwy
NB 05/28/2008   10:00PM 05/29/2008   05:00AM Imperial Hwy Mainline #1 4 Shoulder Reconstruction,
Firestone Blvd
NB 05/28/2008   10:00PM 05/29/2008   05:00AM Rosecrans Ave Mainline #1 4 Shoulder Reconstruction,
Century Frwy, Rte 105
NB 05/28/2008   10:00PM 05/29/2008   05:00AM Del Amo Blvd Mainline #1,#2 4 Shoulder Reconstruction,
Long Beach Blvd
NB 05/28/2008   10:00PM 05/29/2008   05:00AM San Diego Frwy, Rte 405 Mainline #1,#2 4 Shoulder Reconstruction,
Del Amo Blvd
NB 05/28/2008   10:00PM 05/29/2008   05:00AM San Diego Frwy, Rte 405 Mainline #4 4 Guardrail Repair,
Del Amo Blvd
NB 05/28/2008   10:00PM 05/29/2008   05:00AM SB Long Beach Frwy Off-Ramp All 1 Guardrail Repair,
EB Wardlow Rd
SB 05/28/2008   10:00PM 05/29/2008   05:00AM Artesia Frwy, Rte 91 Mainline #1 3 Shoulder Reconstruction,
Long Beach Blvd
SB 05/28/2008   10:00PM 05/29/2008   05:00AM San Diego Frwy, Rte 405 Mainline #1 3 Shoulder Reconstruction,
Wardlow Rd
SB 05/28/2008   10:00PM 05/29/2008   05:00AM Del Amo Blvd Mainline #1,#2 4 Shoulder Reconstruction,
San Diego Frwy, Rte 405
SB 05/28/2008   10:00PM 05/29/2008   05:00AM Long Beach Blvd Mainline #1,#2 4 Shoulder Reconstruction,
Del Amo Blvd
SB 05/28/2008   10:00PM 05/29/2008   05:00AM Rosecrans Ave Mainline #1,#2,#3 5 Shoulder Reconstruction,
Alondra Blvd
SB 05/28/2008   10:00PM 05/29/2008   05:00AM Del Amo Blvd Mainline #4 4 Guardrail Repair,
San Diego Frwy, Rte 405
SB 05/28/2008   10:00PM 05/29/2008   05:00AM Rosecrans Ave Mainline #4 4 Guardrail Repair,
Alondra Blvd
NB 05/28/2008   10:00PM 05/29/2008   06:00AM Cesar Chavez Ave Mainline #1