Contractors
ea: 296704
Route:
118
County:
Ven
Work:
| Mile Post Beg./End: | 21.8/32.6 |
| Location: | IN VENTURA COUNTY, FROM ARROYO OH TO LA/VENTURA COUNTY LINE |
| Detailed Project Scope: | Pavement Repair & Curb Ramps |
| Estimate Cost Range (x $million) | 10 - 20 |
| Working Days Range: | 350 |
| Proposed Advertisement Date: | 2018-01-01 |
| Comments: | Quantities not defined well enough in CAPM PR (Jan 13). 95 lane-mile RHMA-G 680 slabs 45 curb ramps |
| Types Of Work |
| Asphalt Concrete Surfacing |
| Groove Pavement |
| Guard Railing |
| Highway Planting |
| Rehabilitate Pavement |
| Replace PCC Pavement |
| Seal Coat |
| Wheelchair Ramps |
| Quantity Of Major Highway Items |
| Asphalt Condrete (Tons) | 0 |
| PCC (cy) | 0 |
| Aggregate Base (cy) | 0 |
| Imported Borrow (cy) | 0 |
| Roadway Excavation (cy) | 0 |
| Major Structure Items |
| Steel (lbs): | 0 |
| PCC (cy): | 0 |