ea: 291204
Route:
057
County:
LA
Work:
| Mile Post Beg./End: | 7.7 /12.2 |
| Location: | IN LA, RTE 57 FR PM 7.7/12.2, RTE 60 FR PM 0.0/6.9 |
| Detailed Project Scope: | ADA RAMPS |
| Estimate Cost Range (x $million) | 1 - 10 |
| Working Days Range: | 250 |
| Proposed Advertisement Date: | 2014-11-01 |
| Comments: | 120 curb ramps, 850 LF of sidewalk, and 5 pedestrian push bottons and signals. |
| Types Of Work |
| Signals |
| Wheelchair Ramps |
| Quantity Of Major Highway Items |
| Asphalt Condrete (Tons) | 0 |
| PCC (cy) | 0 |
| Aggregate Base (cy) | 0 |
| Imported Borrow (cy) | 0 |
| Roadway Excavation (cy) | 0 |
| Major Structure Items |
| Steel (lbs): | 0 |
| PCC (cy): | 0 |