Quick links
Additional Links
- Strategic Growth Plan - Transportation Investments for Mobility
- Divisions
- Legislative Info
- Outside Agencies
- Inside Seven Employee Newsletter
- code survey - a project by renée green
- Early Education Center - The Center offers spacious rooms for infants, toddlers and pre-schoolers and is open to the public.
- District 7 Video Library
Contractors
ea: 2777U4
Route:
5
County:
LA
Work:
| Mile Post Beg./End: | 25.2/27.0 |
| Location: | IN LOS ANGELES ON ROUTE 5 FROM COLORADO EXTENSION TO HAZEL STREET PUC AND ON ROUTE 134 FROM VICTORY BOULEVARD/RIVERSIDE DRIVE TO SAN FERNANDO ROAD |
| Detailed Project Scope: | EROSION CONTROL |
| Estimate Cost Range (x $million) | 1 - 10 |
| Working Days Range: | 250 |
| Proposed Advertisement Date: | 2013-07-01 |
| Comments: | Was 277704. Combined with 277504 and 277604. Quantites shown as zero is correct. Permeable paving system and planting. |
| Types Of Work |
| Erosion Control |
| Highway Planting |
| Quantity Of Major Highway Items |
| Asphalt Condrete (Tons) | 0 |
| PCC (cy) | 0 |
| Aggregate Base (cy) | 0 |
| Imported Borrow (cy) | 0 |
| Roadway Excavation (cy) | 0 |
| Major Structure Items |
| Steel (lbs): | 0 |
| PCC (cy): | 0 |
