ea: 2759U4

Route: 110     County: LA     Work:
Mile Post Beg./End: 23.5/23.9
Location: IN LA CNTY IN LA ON N/B RTE 110 AT THE RTE 101 IC
Detailed Project Scope: SOURCE CONTROL
Estimate Cost Range (x $million) 1 - 10
Working Days Range: 250
Proposed Advertisement Date: 2013-07-01
Comments: Quantites shown as zero is correct. Permeable paving system and planting.
Types Of Work  
Arrow Erosion Control
Arrow Highway Planting
Quantity Of Major Highway Items  
Asphalt Condrete (Tons) 0
PCC (cy) 0
Aggregate Base (cy) 0
Imported Borrow (cy) 0
Roadway Excavation (cy) 0
Major Structure Items  
Steel (lbs): 0
PCC (cy): 0