Welcome to the State of California Caltrans, District 7 Header
Governor Brown Brian P. Kelly Malcolm Dougherty Michael Miles
 
Caltrans District 7 0n Twitter
Caltrans District 7 On Friendfeed
Caltrans District 7 on FeedBurner
Caltrans District 7 RSS Feed (Atom)
 

ea: 275404

Route: 1     County: LA     Work:
Mile Post Beg./End: 1.0
Location: Pacific Coast Highway, At Alamitos Bay Bridge
Detailed Project Scope: SEISMC RETROFIT (BRIDGE 53-0064)
Estimate Cost Range (x $million) 10 - 20
Working Days Range: 400
Proposed Advertisement Date: 2016-07-01
Comments: PSR Q
Types Of Work  
Arrow Bridge
Quantity Of Major Highway Items  
Asphalt Condrete (Tons) 2
PCC (cy) 0
Aggregate Base (cy) 0
Imported Borrow (cy) 0
Roadway Excavation (cy) 0
Major Structure Items  
Steel (lbs): 0
PCC (cy): 0

Page Last Modified 03/5/13 08:58
Back Button | Back To Page Top Link