Interim PID (PIR) SWDR

Share via:


Office of Hydraulics & Stormwater Design is piloting two new PID (PIR) SWDR processes. The first process should be used by engineers and landscape architects that like less guidance. The second process is for those who prefer more.

Excel Spreadsheet SWDR imbedded with guidance. It is one page.

(PIR SWDR spreadsheet)

Typical Short and Long Forms minimized to meet the new PIR process. Example reports are provided to see what a typical one looks like. A Guide is provided including PIR SWDR Risk Management.

(PIR SWDR Short Form and Long Form)