1070030LEAD COMPLIANCE PLANLSLUMP SUM
2120090CONSTRUCTION AREA SIGNSLSLUMP SUM
3035477RETROREFLECTIVE SHEETING(TYPE XI)SQFT1,400
4120100TRAFFIC CONTROL SYSTEMLSLUMP SUM
5120116TYPE II BARRICADEEA24
6128652PORTABLE CHANGEABLE MESSAGE SIGN (LS)LSLUMP SUM
7130100JOB SITE MANAGEMENTLSLUMP SUM
8130300PREPARE STORM WATER POLLUTION PREVENTION PLANLSLUMP SUM
9130560TEMPORARY SOIL BINDERSQYD9,200
10130620TEMPORARY DRAINAGE INLET PROTECTIONEA30
11130640TEMPORARY FIBER ROLLLF1,170
12130730STREET SWEEPINGLSLUMP SUM
13130900TEMPORARY CONCRETE WASHOUTLSLUMP SUM
14190101ROADWAY EXCAVATIONCY370
15190185SHOULDER BACKINGTON230
16200002ROADSIDE CLEARINGLSLUMP SUM
17200052PRUNE EXISTING PLANTSLSLUMP SUM
18200114ROCK BLANKETSQFT68,700
19202028RELOCATE IRRIGATION CONTROLLEREA1
20205033GRAVEL MULCHSQFT31,700
21205035WOOD MULCHCY250
22206400CHECK AND TEST EXISTING IRRIGATION FACILITIESLSLUMP SUM
23206402OPERATE EXISTING IRRIGATION FACILITIESLSLUMP SUM
24206405REMOVE IRRIGATION FACILITYLSLUMP SUM
25206559CONTROL AND NEUTRAL CONDUCTORS (ARMOR-CLAD)LSLUMP SUM
262065621" REMOTE CONTROL VALVEEA5
272066342" WYE STRAINER ASSEMBLYEA1
282085752" GATE VALVEEA1
29(F)2085982" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)LF1,030
30(F)2086052" PLASTIC PIPE (CLASS 315) (SUPPLY LINE)LF360
31208640PRESSURE REGULATING VALVEEA1
32210350FIBER ROLLSLF400
33260203CLASS 2 AGGREGATE BASE (CY)CY190
34390132HOT MIX ASPHALT (TYPE A)TON340
35394073PLACE HOT MIX ASPHALT DIKE (TYPE A)LF110
36394090PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA)SQYD1,080
37398001REMOVE ASPHALT CONCRETE PAVEMENT (SQFT)SQFT9,130
38803140RECONSTRUCT CHAIN LINK FENCELF100
39820510RESET ROADSIDE SIGN (ONE POST)EA71
40035478POST SLEEVEEA83
41820520RESET ROADSIDE SIGN (TWO POST)EA6
42832070VEGETATION CONTROL (MINOR CONCRETE)SQYD440
43(F)839521CABLE RAILINGLF260
44870009MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTIONLSLUMP SUM
45872130MODIFYING EXISTING ELECTRICAL SYSTEMLSLUMP SUM
46999990MOBILIZATIONLSLUMP SUM