Note: This list is not updated when addenda are issued. For informational purposes only.
Contract Number 05-0C6414
Date Adv.: 06/18/2018

Item No.Item
Code
Item Description Unit of
Measure
Estimated
Quantity
1070030LEAD COMPLIANCE PLANLSLUMP SUM
2120090CONSTRUCTION AREA SIGNSLSLUMP SUM
3120100TRAFFIC CONTROL SYSTEMLSLUMP SUM
4130100JOB SITE MANAGEMENTLSLUMP SUM
5130200PREPARE WATER POLLUTION CONTROL PROGRAMLSLUMP SUM
6130610TEMPORARY CHECK DAMLF200
7130620TEMPORARY DRAINAGE INLET PROTECTIONEA17
8130640TEMPORARY FIBER ROLLLF100
9146002CONTRACTOR-SUPPLIED BIOLOGIST (LS)LSLUMP SUM
10200002ROADSIDE CLEARINGLSLUMP SUM
11202006SOIL AMENDMENTCY49
12202038PACKET FERTILIZEREA660
13204008PLANT (GROUP H)EA140
14204013PLANT (GROUP M)EA1,760
15204035PLANT (GROUP A)EA330
16204099PLANT ESTABLISHMENT WORKLSLUMP SUM
17205035WOOD MULCHCY230
18035525FOLIAGE MESH PROTECTOREA1,760
19205061ROOT PROTECTOREA330
200355261" WYE FILTER ASSEMBLYEA7
21(F)0355272" GALVANIZED STEEL PIPE (SLEEVE)LF80
22(F)2082213/4" DRIP IRRIGATION TUBINGLF27,100
23208562CAM COUPLER ASSEMBLYEA7
24(F)2085951" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)LF725
25(F)2085971 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)LF6,700
26208670CHECK VALVEEA52
27208683BALL VALVEEA3
28210212DRY SEED (SQFT)SQFT3,700
29999990MOBILIZATIONLSLUMP SUM