Note: This list is not updated when addenda are issued. For informational purposes only.
Contract Number 03-3F9204
Date Adv.: 11/13/2017

Item No.Item
Code
Item Description Unit of
Measure
Estimated
Quantity
1070030LEAD COMPLIANCE PLANLSLUMP SUM
2100100DEVELOP WATER SUPPLYLSLUMP SUM
3120100TRAFFIC CONTROL SYSTEMLSLUMP SUM
4128652PORTABLE CHANGEABLE MESSAGE SIGN (LS)LSLUMP SUM
5130100JOB SITE MANAGEMENTLSLUMP SUM
6130300PREPARE STORM WATER POLLUTION PREVENTION PLANLSLUMP SUM
7130310RAIN EVENT ACTION PLANEA13
8130320STORM WATER SAMPLING AND ANALYSIS DAYEA16
9130330STORM WATER ANNUAL REPORTEA2
10130505MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)EA6
11130530TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)SQYD2,300
12130570TEMPORARY COVERSQYD2,300
13130610TEMPORARY CHECK DAMLF550
14130640TEMPORARY FIBER ROLLLF1,100
15130680TEMPORARY SILT FENCELF1,100
16130710TEMPORARY CONSTRUCTION ENTRANCEEA2
17130730STREET SWEEPINGLSLUMP SUM
18130900TEMPORARY CONCRETE WASHOUTLSLUMP SUM
19141001HEALTH AND SAFETY PLANLSLUMP SUM
20170103CLEARING AND GRUBBING (LS)LSLUMP SUM
21190101ROADWAY EXCAVATIONCY1,290
22198010IMPORTED BORROW (CY)CY1,700
23202006SOIL AMENDMENTCY1.6
24202038PACKET FERTILIZEREA18
25204009PLANT (GROUP I)EA18
26205035WOOD MULCHCY1.6
27034212TIME RELEASE WATER ASSEMBLYEA18
28210252BONDED FIBER MATRIX (SQFT)SQFT33,200
29210610COMPOST (CY)CY95
30210630INCORPORATE MATERIALSSQFT7,700
31260203CLASS 2 AGGREGATE BASE (CY)CY2,110
32390132HOT MIX ASPHALT (TYPE A)TON1,330
33397005TACK COATTON1.3
34(F)610300CONCRETE BACKFILL (PIPE TRENCH)CY4.6
3565001418" REINFORCED CONCRETE PIPELF38
3670501118" STEEL FLARED END SECTIONEA2
37710132REMOVE CULVERT (LF)LF29
38710167REMOVE FLARED END SECTION (EA)EA2
39800360CHAIN LINK FENCE (TYPE CL-6)LF1,250
40803150RECONSTRUCT CHAIN LINK GATEEA2
41820620RELOCATE ROADSIDE SIGN (METAL POST)EA1
42994650BUILDING WORKLSLUMP SUM