Note: This list is not updated when addenda are issued. For informational purposes only.
Contract Number 03-0G5104
Date Adv.: 07/31/2017

Item No.Item
Code
Item Description Unit of
Measure
Estimated
Quantity
1070030LEAD COMPLIANCE PLANLSLUMP SUM
2120090CONSTRUCTION AREA SIGNSLSLUMP SUM
3120100TRAFFIC CONTROL SYSTEMLSLUMP SUM
4120120TYPE III BARRICADEEA20
5128652PORTABLE CHANGEABLE MESSAGE SIGN (LS)LSLUMP SUM
6130100JOB SITE MANAGEMENTLSLUMP SUM
7130200PREPARE WATER POLLUTION CONTROL PROGRAMLSLUMP SUM
8130900TEMPORARY CONCRETE WASHOUTLSLUMP SUM
9141110WORK AREA MONITORING (BRIDGE)LSLUMP SUM
10(F)510053STRUCTURAL CONCRETE, BRIDGECY0.1
11511118CLEAN EXPANSION JOINTLF1,562
12519088JOINT SEAL (MR 1")LF914
13519091JOINT SEAL (MR 1 1/2")LF564
14519100JOINT SEAL (MR 2")LF84
15(F)520102BAR REINFORCING STEEL (BRIDGE)LB18
16(F)550102STRUCTURAL STEEL (BRIDGE)LB9
17590115CLEAN AND PAINT STRUCTURAL STEELLSLUMP SUM
18590135SPOT BLAST CLEAN AND PAINT UNDERCOATSQFT1.5
19600011RAPID SETTING CONCRETE (PATCH)CF5
20600013REPAIR SPALLED SURFACE AREASQFT37
21600033REMOVE UNSOUND CONCRETECF5
22600035POLYESTER CONCRETE EXPANSION DAMCF4
23600114BRIDGE REMOVAL (PORTION)LSLUMP SUM
24045858RECONSTRUCT BRIDGE RAILINGLSLUMP SUM
25872130MODIFYING EXISTING ELECTRICAL SYSTEMLSLUMP SUM
26999990MOBILIZATIONLSLUMP SUM