Inquiry #1: Complete the plant establishment work within 125 working days.
There is no bid item for this work.

Inquiry submitted 07/23/2018

Response #1:Pending
Response posted 07/23/2018




Inquiry #2: Bid item 42(F) 560218 Furnish Sign Structure (Truss) - Please clarify if walkways are required on these 3 Cantilever Sign Structures or if walkways are not wanted? Details do not show walkways on these structures however the standards still call out to use walkways unless it is noted not to have them.
Inquiry submitted 07/24/2018

Response #1:Pending
Response posted 07/24/2018


Response #2:Please bid per the Contract documents. Walkways are not required on the overhead sign structures.
Response posted 07/26/2018




Inquiry #3: Please provide work category codes and NAICS categories that pertain to this project.
Inquiry submitted 08/01/2018

Response #1:Pending
Response posted 08/01/2018




Inquiry #4: Per the Caltrans Standard plan for CRCP, the pavement section should receive a rumble strip outside the ETW. Is this required and if so, where does it get paid?
Inquiry submitted 08/09/2018

Response #1:Pending
Response posted 08/09/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.