Bidder Inquiries

Sign In | Create Account

Viewing inquiries for 06-0S3104

Submit new inquiry for this project

Inquiry #1: In spec section 14-11.08C, the State provides the limits of the Z-2 Lead material. Based on the lengths given in this section, if the contractor assumes a 6' wide and 1' deep area for the 7,780 LF as stated in the specifications the contractor comes up with about 4 times as much Z-2 material to off-haul. Will the state either increase the quantity, or specify the areas on the layout sheets that are contaminated? Also, will the state please clarify if the Z-2 Material is a final pay item?
Inquiry submitted 12/20/2017

Response #1:Submitted for consideration.
Response posted 12/21/2017

Response #2:Refer to Addendum No 2, dated January 10, 2018.
Response posted 01/10/2018

Inquiry #2: How does the State plan to pay for the removal of the existing structural sections in the median? Typically, the State utilizes 190101 Roadway Excavation for this scope.
Inquiry submitted 12/26/2017

Response #1:Submitted for consideration.
Response posted 12/28/2017

Response #2:Refer to Addendum No 2, dated January 10, 2018.
Response posted 01/10/2018

Inquiry #3: Will the state please add a minor concrete bid item for the backfill of the 660' of slotted drain, and a detail showing how the slotted drain matches up with the adjacent finished grade in between clean-outs?
Inquiry submitted 01/05/2018

Response #1:Submitted for consideration.
Response posted 01/08/2018

Response #2:Standard Plan Sheet D98B shows the detail for Backfill for the slotted corrugated steel pipe drain.
Response posted 01/10/2018

Inquiry #4: Plan sheet C-1 through C-9 are pavement elevation plans that show elevations to the thousandths every 50 feet. Are these elevations to be adhered to? Are the outside elevations where the new pavement ties to the existing pavement going to meet these exact elevations shown on the plans C-1 through C-9? Wouldn't the existing paving determine these elevations? Are there tolerances to these elevations or is the Contractor going to be held to meet these elevations to the thousandth?
Inquiry submitted 01/11/2018

Response #1:Submitted for consideration.
Response posted 01/11/2018

Response #2:Existing pavement should be conformed to and Standard Specification 19-1.03C Grade Tolerance should apply. The Department places stakes and marks under Chapter 12, "Construction Surveys," of the Department's Surveys Manual.
Response posted 01/12/2018

The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.