Inquiry #1: ITEM #116, MIDWEST GUARDRAIL SYSTEM:
MGS is quantified from "C" 285+90 to 287+85 = 195 LF. Is this the length of the Guardrail, only, or of the total run, including WB & Flared Terminal system?

What concrete structure does Item #120, Transition Railing, Type WB-31 connect to?

Inquiry submitted 01/09/2018

Response #1:Submitted for consideration.
Response posted 01/09/2018


Response #2:Per Addendum#2 sheet-Q2, revised quantity covers only Guardrail length.

Per Addendum#2, Item #120 is deleted and Item#132 is added.

Response posted 01/18/2018




Inquiry #2: Can we get some clarification as to which bid item number does the 6' chain link gate (Type CL-6) fall under. I only see under the revised Bid Item List issued with Addendum 2, Bid Item Number 108 - 4' chain link gate (Type CL-6) with a quantity of 3 in total. 2 of these gates are shown on plan sheet L-1, which was revised per Addendum 2, but it also shows a 6' chain link gate (Type CL-6). Please clarify as to whether this is a typo or does this gate fall under bid item 108 as the third gate?
Inquiry submitted 01/19/2018

Response #1:Submitted for consideration.
Response posted 01/22/2018


Response #2:Layout sheet has a typo for 1 gate.
All 3 of these gates are under Bid Item Number 108 - 4' chain link gate (Type CL-6).

Response posted 01/23/2018




Inquiry #3: Bid item 44 on page 5 requires the installation of a remote control valve with flow sensor.
However, no other information is given.
Please clarify what remote control valve with flow sensor is require.

Inquiry submitted 01/19/2018

Response #1:Submitted for consideration.
Response posted 01/22/2018


Response #2:The remote control valve with flow sensor is one that is compatible with the ET Water Smart Controller.
Response posted 01/23/2018




Inquiry #4: Sheet No 161 Note 2 state that the Simulated Wave Texture (at sides of bridge) to be stained with various blue colors. Special Provisions Section 78-4.04 Incidental Construction, require an acid based stain which cannot produce the blue colors, only earth tone colors. Can section 78-4.03 (Concrete acrylic paint or stains) be used to match the blue colors specified in the plans? Without this approval, the blue colors cannot be matched as specified.
Inquiry submitted 01/22/2018

Response #1:Please bid per current contract documents.
Response posted 01/23/2018




Inquiry #5: Please advise on duration for Plant Establishment Work. No information provided in the Notice to Bidders.
Inquiry submitted 01/23/2018

Response #1:Submitted for consideration.
Response posted 01/23/2018


Response #2:PEW is 1 year per Addendum #1.
Response posted 01/23/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.