Viewing inquiries for 04-2537H4

Submit new inquiry for this project


Inquiry #1: There is no bid item for Traffic Control on this project. Where is traffic control to be paid under which items..
Inquiry submitted 11/01/2017

Response #1:Submitted for consideration.
Response posted 11/02/2017


Response #2:Full compensation for traffic control items shall be considered to be included in payment for other bid items, as noted in section 9-1.03.
Response posted 11/03/2017




Inquiry #2: Bid item # 2 Develop Water Supply, there are no specifications or direction for this bid item. We found 4 existing water meters belonging to ACWD and (1) CCA. Is this bid item for this CCA to cover the watering cost for the Plant Establishment Period? If not please advise what the bid item includes.
Inquiry submitted 11/01/2017

Response #1:Submitted for consideration.
Response posted 11/02/2017


Response #2:Develop Water Supply is for the cost of watering the area covered by the CCA valve.
Response posted 11/02/2017




Inquiry #3: Sheet IQ-4 Irrigation Conduit Qty Callouts, Conduit # 8 on Sheet IP-12 WB line Station #16+16 Show this conduit type to be *" CHDPE pipe. This conduit on sheet IP-12 runs across Washington Blvd including a existing island. Since this is CHDPE it would require to be open trench across a 4 lane road, why would you elect not to bore at this location?
Inquiry submitted 11/15/2017

Response #1:Submitted for consideration.
Response posted 11/16/2017


Response #2:Public utilities exist in this area. Open trench was determined to be the more secure option.
Response posted 11/16/2017




Inquiry #4: Are all # 5 Pull boxs to comply with section 86-1.02C and material to be an " integrity" Tier 22 Pull Box? or can we used the Standard # 5 concrete box and lockdown Lid??
Inquiry submitted 11/15/2017

Response #1:Submitted for consideration.
Response posted 11/16/2017


Response #2:Pull boxes must comply with section 86-1.02C of the 2010 Revised Standard Specifications.
Response posted 11/16/2017


Response #3:Pull boxes must be no. 5 or larger and comply with section 86-1.02C, as noted in section 20-2.01B(5) of the 2010 Revised Standard Specifications.
Response posted 11/16/2017




Inquiry #5: Construction plans show 176,364 SF of existing iceplant areas within the project limits. There is no call out to maintain these areas or is there a bid item to maintain existing planting areas. How are these areas to be maintained for the duration of the contract??
Inquiry submitted 11/16/2017

Response #1:Submitted consideration.
Response posted 11/16/2017


Response #2:Existing iceplant is covered under Preservation of Property in the Standard Specifications.
Response posted 11/16/2017




Inquiry #6: Plant legend for basin mulch and area mulch call out is for "TB" Tree bark, is this walk on bark that the state wants. Project adjoining this 04-2537C4 was using Tree Trimmings? why such a vast difference in material as well as high increase in price. Please clarify that this is the type of material for this project
Inquiry submitted 11/16/2017

Response #1:Submitted for consideration.
Response posted 11/16/2017


Response #2:Please bid per the plant legend.
Response posted 11/16/2017


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.