Inquiry #1: Please clarify aluminum storefront system requirements.
• Clarify thermal requirements for project. Requirements listed in Spec. Section 99-84113, 2.1.J cannot be met with thermally broken storefront and glazing specified in Section 99-08810B(2) Glazing.

• Clarify aluminum storefront system glazing plane. Spec Section 99-084113, 2.3.A.3 calls for the glazing plane to be a FRONT Set storefront system. Plan details show all storefront systems to be a CENTER set storefront system.

• Clarify if aluminum entrance doors are to be thermal doors. Specifications do not call for thermal doors, only reference doors to have an overall thickness of 2”. Reference Section 99-084113, 2.5.A.1. Architectural details in plans show both thermal and non-thermal door details.



Inquiry submitted 11/06/2017

Response #1:Submitted for consideration.
Response posted 11/06/2017


Response #2:Please bid per the current contract documents.
Response posted 11/29/2017




Inquiry #2: I do not see any mention of builders risk for this project-whether it is to be required of F&H Construction or whether the State is providing. If the State will provide, we would like to know what the deductible is for F&H Construction and our subs.

Thank you for your attention.

Inquiry submitted 11/09/2017

Response #1:Submitted for consideration.
Response posted 11/09/2017


Response #2:Bid per plans and specifications.
Response posted 11/13/2017




Inquiry #3: Section 99-074213.19, Part 2.2.B.3 and 2.2.B.4 specify "Panel Thickness: 2.0 inches" and "Thermal Resistance Value (R-value): R-14..." respectively.

Drawing Sheet A0-043, Wall Type 1A and 1B call for "3" Insulated Metal Wall Panel System (R-21 Min)."

Please confirm all Insulated Metal Wall Panel Systems are to be 3" thickness (R-21 Min.).

Inquiry submitted 11/15/2017

Response #1:Submitted for consideration.
Response posted 11/16/2017


Response #2:Addendum No. 1 was posted on November 22, 2017 to answer Bidder Inquiry #3.
Response posted 12/05/2017




Inquiry #4: Reference Bid Item #29, Remove Base and Surfacing. If it is the Contractor's intent to send the spoils generated by this scope of work (asphalt and aggregate base) to a recycling facility for processing, are these spoils still considered a Type H soil per SP14-11.11. Must these spoils still be transported to a hazardous waste facility per SP14-11.11?
Inquiry submitted 11/16/2017

Response #1:Submitted for consideration.
Response posted 11/17/2017


Response #2:Remove base and surfacing are not Type H soil.
Response posted 11/17/2017




Inquiry #5: Where can we find the attendees list for the mandatory prebid meeting on November 16th?
Inquiry submitted 11/17/2017

Response #1:A link would be provided in this webpage when the list is posted.
Response posted 11/17/2017


Response #2:Follow the link below and click on the appropriate link.

www.dot.ca.gov/dist4/smallbusiness/outreach_archive.htm
Response posted 12/04/2017




Inquiry #6: Ref. Special Provision Division XI Building Construction; Section 99-051200 "Structural Steel Framing", Paragraph 2.8 "Shop Priming", A.6 says do not prime steel surfaces enclosed in interior construction. Is the building structural steel on this project considered enclosed in interior construction, or is shop priming required?
Inquiry submitted 11/17/2017

Response #1:Submitted for consideration.
Response posted 11/17/2017


Response #2:Please bid per the current contract documents.
Response posted 11/21/2017




Inquiry #7: Ref. Special Provision Division 1, Section 9 "Payment"; Will Structural steel be added to the list of items eligible for progress payment even though not incorporated into the work?
Inquiry submitted 11/17/2017

Response #1:Submitted for consideration.
Response posted 11/17/2017


Response #2:Structural steel on this project is not a separate bid item. It is included in the lump sum bid item for building work. Therefore it is not eligible for partial payment for materials on hand.
Response posted 11/20/2017




Inquiry #8: Can you please confirm that this project does not have any DBE or DVBE goals. So, good faith efforts are not necessary?
Inquiry submitted 11/21/2017

Response #1:Submitted for consideration.
Response posted 11/28/2017


Response #2:Correct. From the Notice to Bidders, "The Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE participation."
Response posted 11/28/2017




Inquiry #9: Will the sign in lists be posted from the pre-bid meeting that was held on Nov 16, 2017?
Inquiry submitted 11/22/2017

Response #1:Submitted for consideration.
Response posted 11/28/2017


Response #2:See response to BI #5.
Response posted 12/04/2017




Inquiry #10: Question #1
Please clarify on bid item 17 and 18 the work to be done to reconstruct the security metal sliding gate and fence. Show pictures or details of work to be done.

Question # 2
Drawing L-1 shows Security Metal Fence, please provide the specs for the type of metal fence.

Question #3
There is no bid item for this work to be done, linear footage of the fence, 2 sliding gates and 1 double gate

Question #4
There is a double gate, please provide details of the type of hardware needed for this gate.

Question #5
There are two sliding gates at the entrance, are they to be opened automatically?, if they are please provide the specs for the gate motors.

Question #6
Along Burma Road, there is a big pipe that carries some kind of dangerous gas, Last time we worked in the same area, we were told to hand dig in this area, Are we going to get compensated since we can not use a bobcat to dig, or have this included in the bid item?

Please advice

Thanks

Bailey Fence Company

Inquiry submitted 11/27/2017

Response #1:Submitted for consideration.
Response posted 11/28/2017


Response #2:1) Reconstruct security metal sliding gate and fence must comply with the specifications for new gates and fence of similar character.

2) See section 80 of the Special Provisions.

3) New fences and gates are parts of the additive bid item. See the "Special Notices" page of the Special Provisions.

4) Details of the double gate are shown on plan sheet #8 (Sheet C-5)

5) See plan sheet #363 (sheet EE0-110) for details.

6) Bid per plans and specifications. See section 5-1.36C, Non-highway Facilities, Special Provision sheet 16 of 263.
Response posted 11/28/2017




Inquiry #11: Are cross sections available for this project? If so, how can they be obtained?
Inquiry submitted 11/27/2017

Response #1:Submitted for consideration.
Response posted 11/28/2017


Response #2:You can download the cross sections below:

http://www.dot.ca.gov/dist4/construction/contracts/04-014114/04-014111-Cross-sections.pdf
Response posted 11/29/2017




Inquiry #12: Reference Bid Item #20, Roadway Excavation (Type H). If grading for the parking lot requires fill, is it acceptable to reuse native material by moving cuts to fill?
Inquiry submitted 11/28/2017

Response #1:Submitted for consideration.
Response posted 11/28/2017


Response #2:Type H soil must be disposed at CA class I disposal facility. See Special Provisions section 14-11.11C(7).
Response posted 11/28/2017




Inquiry #13: Hi,

Will an addenda be issued to change the bid date?

Thank you,

Inquiry submitted 11/29/2017

Response #1:Submitted for consideration.
Response posted 11/30/2017


Response #2:There are no plans to delay the bid opening.
Response posted 11/30/2017




Inquiry #14: Please post the list of prebid attendees ASAP.
Inquiry submitted 12/01/2017

Response #1:Follow the link below and click on the appropriate link.

www.dot.ca.gov/dist4/smallbusiness/outreach_archive.htm
Response posted 12/04/2017




Inquiry #15: Can the bid date be pushed out a week, we are interested in bidding, working on bonds, but don't have the surety2000 yet
Inquiry submitted 12/04/2017

Response #1:Submitted for consideration.
Response posted 12/05/2017


Response #2:There are no plans to delay the bid opening.
Response posted 12/06/2017




Inquiry #16: The list of bid items does not include any specific bid items for the landscaping, irrigation or the plant establishment work. All of the landscape, irrigation and planting drawings, (sheets 38 thru 51) states “Additive Bid Item” in the lower bottom right hand corner.

Section 78.23.01 States “ Section 78-23 includes specifications for performing additive work. This project includes additive work shown as additive bid item 1. The sum of the amounts for the work items in the table titled “Additive Work Items” must equal the lump sum price bid for additive bid item 1.”

Section 78-23 also references Section 20 Landscape as the applicable section related to the added work referenced in Section 78-23.

Notice to Bidders states the following

• Complete the work, excluding the plant establishment work within 300 working days.
• Complete the work, including the plant establishment work within 550 working days.
• Complete the plant establishment work within 250 working days.

The Bid Item Schedule included in the Bid Documents does not include Additive Bid Item #1 nor has Addendum #1 and 2 addressed the missing bid item.

Please advise if a updated list of bid items will be provided by Cal Trans for the Additive Bid Item 1 work.


Inquiry submitted 12/04/2017

Response #1:Submitted for consideration.
Response posted 12/05/2017


Response #2:The bidder must submit a lump sum bid for the additive bid item 1 based on the quantity sheets that show the additive work on plan sheets 35, 38, 44, 45, 47, and 51.
Response posted 12/05/2017




Inquiry #17: So, are you pushing the bid out? I was not given a response to the inquiry dated 12-4-17
Inquiry submitted 12/06/2017

Response #1:There are no plans to delay the bid opening.
Response posted 12/06/2017


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.


Contracting Information

Statewide Alerts and Other Information