Inquiry #1: Other than CIPP, can other approved alternative pipe liners that meet the design and performance criteria ( MACHINE SPIRAL WOUND POLYVINYL CHLORIDE (PVC) PIPELINER (EXPANDABLE DIAMETER per Section 15-536 ) be used for this project?
Inquiry submitted 01/05/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 01/05/2018


Response #2:
No alternative pipe liners will be allowed on this project. Please bid per the current contract documents
Response posted 01/08/2018




Inquiry #2: Per section 71-3.08C(4), it appears that for this bid, Caltrans is only allowing a UV-cure for the CIPP. If a styrene-free resin system is used in the CIPP, will Caltrans allow the Contractor to use a heat-cure for the CIPP?
Inquiry submitted 01/08/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 01/09/2018


Response #2:
A non-styrene resin with heat cured CIPP is not allowed for this project. Please bid per the current contract documents.
Response posted 01/16/2018




Inquiry #3: How long and of a warranty period is Caltrans requiring for the CIPP? The specs did not mention a specific warranty type or period.
Inquiry submitted 01/11/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 01/12/2018


Response #2:
Your attention is directed to Section 5-1.47, "Guarantee", of the Standard Specifications. Please bid per the current contract documents.
Response posted 01/16/2018




Inquiry #4: Per specification section 71-3.08A(1), the resin for the CIPP on this project must be low styrene, and per 71-3.08B(4), it must also be a vinyl ester system. However, we noticed that in the CA Dept. of Fish & Wildlife permit contained in the Info Handout, only 4 of the culverts on the project are called out with a requirement to use a non-styrene resin system. Will only the 4 culverts listed in the CDFW permit (drainage system nos. 2, 5, 7, & 9) require the use of a non-styrene vinyl ester resin system for the CIPP, or is that type of resin system required to be used for all the CIPP installed on this project?
Inquiry submitted 01/11/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 01/12/2018


Response #2:
Only the 4 locations listed in the CDFW permit require the use of a non-styrene vinyl ester resin system for the CIPP.
Response posted 01/16/2018




Inquiry #5: Will the Owner consider extending the bid date a minimum of one week to allow for Contractors to adequately address constructability issues with regards to the required use of non-styrene UV cure CIPP on this project.
Inquiry submitted 01/22/2018

Response #1:
Your inquiry has been received and is being reviewed. If a response is not posted before bid opening addressing your inquiry, please bid per the current contract documents.
Response posted 01/22/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.