Viewing inquiries for 03-1H3804

Submit new inquiry for this project


Inquiry #1: 2 specific files are unable to be downloaded
03-1H3804 SUPPLEMENTAL_INFO A1/MAINLINE X-SECTION.PDF
03-1H3804 SUPPLEMENTAL_INFO A1/RAMP X-SECTION.PDF
Please fix online.

Inquiry submitted 03/13/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 03/13/2018


Response #2:
All files should be available for download now. Please bid per the current contract documents.
Response posted 03/15/2018




Inquiry #2: Please provide PDF cross-sections (@50' intervals) in order for contractors to accurately quantify Grading Cut-Fill Volumes.
Inquiry submitted 03/13/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 03/13/2018


Response #2:
Please bid per the current contract documents.
Response posted 03/26/2018




Inquiry #3: The bid list indicates a contractor-supplied biologist or CSB listed under Bid Line Item 18, Code 146002 is needed for this project. In reviewing the project documents it is unclear as to the extent of the role of the CSB. What is the frequency (e.g., daily, weekly) the CSB is expected to be on site over the life of the project? Thank you.
Inquiry submitted 03/23/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 03/26/2018


Response #2:
Your attention is directed to Sections 14-6.03 and 14-6.03D of the Standard Specifications and Special Provisions. The CSB will determine the frequency needed to complete the tasks listed in section 14-6.03D of the Standard Specification and Special Provisions. Please bid per the current contract documents.
Response posted 03/26/2018




Inquiry #4: Could you please clarify the required time period to pave back cold planed areas? The specs and plans appear to provide different information.
Inquiry submitted 03/30/2018

Response #1:Your inquiry has been received and is being reviewed.
Response posted 03/30/2018


Response #2:(#4)-An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Thurday April 12, 2018.
Please bid per the current contract documents.
Response posted 04/12/2018




Inquiry #5: ITEM #35- 60inch CIDH-SIGN FOUNDATION:
Please provide Geotechnical Report, drill logs, and water table reports for overhead Sign Structure CIDHs.

Inquiry submitted 04/09/2018

Response #1:Your inquiry has been received and is being reviewed.
Response posted 04/10/2018


Response #2:?Your attention is directed to section 49-1.03 of the Special Provisions regarding difficult pile installation due to high ground water typically found between 9? and 12?. There is no additional information available.
Please bid per the current contract documents.?

Response posted 04/11/2018




Inquiry #6: Bid item 36(F) 560218 Sign Structure - Are walkways desired for these 3 OHSS's? Caltrans has been removing walkways from nearly all OHSS's that use Class XI Reflective Sheeting per directives issued and this job is using Class XI sheeting. Sheet SD-2 shows walkway beams attached to the trusses but no other mention is made as to if they are required or not.
Inquiry submitted 04/10/2018

Response #1:Your inquiry has been received and is being reviewed.
Response posted 04/11/2018


Response #2:Walkways are desired as shown in the contract documents.
Your attention is directed to Standard Plan List S16, S17, S17A, and S18 shown in the Special Provisions which covers the fabrication of the walkway.
Response posted 04/11/2018




Inquiry #7: Several of the lane closure charts refer to Motorist Information Plans. Are those available?
Inquiry submitted 04/10/2018

Response #1:Your inquiry has been received and is being reviewed.
Response posted 04/11/2018


Response #2:(#7)-An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Thurday April 12, 2018.
Please bid per the current contract documents.
Response posted 04/12/2018




Inquiry #8: This project has a bid item for Temporary Cover. What material was Caltrans anticipating being generated on the project that would require temporary cover?
Inquiry submitted 04/10/2018

Response #1: Your inquiry has been received and is being reviewed.
Response posted 04/11/2018


Response #2:Your attention is directed to the Temporary Water Pollution Control Quantities table on sheet Q-1 and the 4th paragraph of Section 13-4.03C(3) of the Standard Specifications. Please bid per current contract documents.
Response posted 04/12/2018




Inquiry #9: Page 41, Division X, 86 General states:
"Add to the end of section 86-1.02C(3) of the RSS for section 86: Hold-down bolts must be Penta Head 1/2-13UNC..."

Boxes with Penta Head 1/2" to are not available to purchase from any manufacturer, and thus cannot be provided. 3/8" is the standard- will this be acceptable for this contract?

Inquiry submitted 04/16/2018

Response #1:Your inquiry has been received and is being reviewed.
Response posted 04/16/2018


Response #2:Please bid per the current contract documents.
Response posted 04/17/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.