Inquiry #1: The GR runs on sheet L-40 have a box culvert that is going under the GR. The run on the right side should be good. Looks like it is deep enough, the run on the left side will not be. Wondering how Caltran would like to install GR over box Culvert on left side. Looks like there will be 5 posts that are affected.
Inquiry submitted 10/12/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/13/2017


Response #2:
Your attention is directed to the Revised Standard Plan A77L2 for guardrail post length.
Please bid per the current contract documents.
Response posted 10/18/2017




Inquiry #2: On sheet #3 L-1 it shows a detail at the top of the page for 0.65' HMA Type A which appears to be patching the asphalt in front of the gutter on the streets. However, the Layout Sheets do not show this patching on the front and back side of the new Valley Gutters. Also where is the asphalt accounted for in the summary of quantities?


Please advise.

Inquiry submitted 10/13/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/16/2017


Response #2:Your attention is directed to Construction Detail sheets, C-87 to C-102, and Quantity sheet, Q-2, of the project plans. Asphalt patching is necessary given the removal details shown on these Construction Detail sheets and details provided for the valley gutters in other construction details. The quantity of HMA (Type A) required for the asphalt patching for curb ramps and valley gutters form placement, is included in the Roadway Quantities Table under "Sta 154+66 to 521+00" (44,675 Tons). Please bid per the current contract documents.
Response posted 10/18/2017




Inquiry #3: On sheet C-91 it shows 3/4 of the Street on South Weatherlow St being removed under Roadway Ex. Where is the detailing showing the new street section replacing this excavation in the street? How is the Aggregate Base and HMA accounted for?

Please advise?

Inquiry submitted 10/13/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/16/2017




Inquiry #4: How do we quantify the 800 CY of aggregate base shown in the summary of quantities? Is the aggregate base underneath the concrete or being placed somewhere else? Can you provide a detail?


Please advise.

Inquiry submitted 10/13/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/16/2017




Inquiry #5: Bid item #67 - Pre/Post Construction Surveys. Is a pre survey counted as 1 and a post survey counted as number 2 or is a pre/post survey considered one each? Also is the state still performing all other survey on this project?

Please advise.

Inquiry submitted 10/13/2017

Response #1:
Your inquiry has being received and is being reviewed.
Response posted 10/16/2017


Response #2:
One (1) each Bid Item No. 67 - Pre/Post Construction survey includes both pre-construction and post-construction surveying. All other necessary construction staking will be provided by Caltrans. Please bid per the current contract documents.
Response posted 10/18/2017




Inquiry #6: On plan sheet C-86 the detail for AC Pavement Repair shows 0.33' of cold planning in isolated areas per the chart on Q-7. This is to be performed after the mainline cold planning of 0.3' or 0.2' per the typical cross sections. However on page 148 of the RSS, section 39-3.04A states: "Schedule cold planning activities such that the pavement is cold planned, the HMA is placed, and the area is opened to traffic during the same work shift." I don't see this being feasible with such a tight work window at night not to mention all the electrical loops that will need to be cut in after cold milling and prior to mainline paving.

Please advise.

Inquiry submitted 10/16/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/16/2017




Inquiry #7: On plan sheet C-85, there is a detail for Minor Concrete (Curb) (Type B1-6 Mod). What is the height of this Curb? Where on the plans is this curb called out? Is it paid for under Bid Item 56 as well?


Please advise.

Inquiry submitted 10/16/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/17/2017


Response #2:
Your attention is directed to Construction Detail sheets, C-77, C-85 and C-86 and Quantity sheets Q 3-6, of the Project Plans, as well as Standard Plan, A87A. Details not shown on sheet C-85 are included in the Standard Plan sheet, A87A, per Note 1. The location for placement of this curb is shown on Sheets C-77 and C-86. Please bid per the current contract documents.
Response posted 10/18/2017




Inquiry #8: We noticed the striping spec's were not updated to the new 6" stripe like all of the other jobs in the state the last 8-10 weeks.Unless it gets changed before bid time we will have to bid the old 4" standard. Thank you.
Inquiry submitted 10/20/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/20/2017


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.