Inquiry #1: Can the state please provide the DWG Files for the this project. The XML Files provided appear to be lacking information needed.
Inquiry submitted 11/27/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 11/27/2017


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 1, issued on Thursday, December 28, 2017.
Please bid per the current contract documents.
Response posted 01/02/2018




Inquiry #2: The Special Provisions do not give any indication as to the ability to utilize moving closures for the installation of the traffic stripe. Will Caltrans allow this type of closure on this project?
Inquiry submitted 12/26/2017

Response #1:
Your Inquiry has been received and is being reviewed.
Response posted 12/27/2017


Response #2:
Per the Standard Plans List in the Notice to Bidders and Special Provisions, “The standard plans sheets applicable to this Contract include those listed below.” Standard Plan T17 for Moving Lane Closures is intentionally not included in this list. Allowable closures are described in the Special Provisions in Section 12. Please bid per the current contract documents.
Response posted 01/03/2018




Inquiry #3: The AVMS sign structure shown on Plan Sheet E-1 (90) has a 22' X 5' foundation. Are there any logs of test bore, or anything else that may show sub-grade & water table?

Thanks,

Inquiry submitted 01/01/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 01/02/2018


Response #2:
All available information is provided in the Contract plans, specifications and supplemental information. Please bid per the current contract documents.
Response posted 01/03/2018




Inquiry #4: Bid Item 24 FDR-Foamed Asphalt - Based on our experience from previous projects with foamed asphalt, there is a significant amount of swell in this material once it is processed and graded. Has the State accounted for this surplus of material that will be generated once the final grading and compaction is complete? How will the contractor be compensated for handling and/or disposing this excess material?
Inquiry submitted 01/02/2018

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 01/02/2018


Response #2:
Please bid per the current contract documents.
Response posted 01/03/2018




Inquiry #5: The Project Geo-technical Report indicates that Blasting will not be permitted. However, the Special Provision make no mention of Blasting. Will blasting be allowed?

The Project Geo-technical Report is incomplete. All the attachments were not included with the report.

Inquiry submitted 01/02/2018

Response #1:
Your inquiry has been received and is being reviewed. If a response is not posted before bid opening addressing your inquiry, please bid per the current contract documents.
Response posted 01/03/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.