Bidder Inquiries

Sign In | Create Account

Viewing inquiries for 02-3E7204

Submit new inquiry for this project


Inquiry #1: Are 8 or 9 new APS required at the in intersection of State Route @ Sale (refer to 2nd APS at Location E in the Existing Pole and Equipment Schedule on Plan Sheet E-2)?
Inquiry submitted 10/01/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/02/2017


Response #2:
Please bid per the current contract documents.
Response posted 10/20/2017




Inquiry #2: Where are proposed Piezo Screened Transmission Cables (STC)getting terminated at TMS No. 281 (PM 43.88) on Plan Sheet E-6? I assume they will be terminated either at the existing Pull Box adjacent to the Piezo or at the Route 36/99 Junction 650 feet away. Note that the Piezo Manufacturer recommends a maximum Cable length of 500 feet.
Inquiry submitted 10/01/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/02/2017


Response #2:
Please bid per the current contract documents.
Response posted 10/20/2017




Inquiry #3: Type A HMA is for paving the asphalt between the sawcut line and new concrete and private driveways. On page 23 of the Special Provisions states, The grade of asphalt binder for the Type A HMA must be PG 64-28M(b). Is this correct?
Inquiry submitted 10/05/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/05/2017


Response #2:
Please bid per the current contract documents.
Response posted 10/20/2017




Inquiry #4: Will the State please provide detail for raising AT&T Telecom/Fiber Optic Utility Vaults to Grade?
Inquiry submitted 10/13/2017

Response #1:
Your inquiry has been received and is being reviewed.
Response posted 10/16/2017


Response #2:
Please bid per the current contract documents.
Response posted 10/20/2017




Inquiry #5: Line items 72 through 78 detail thermoplastic striping, without reference to warranty requirements described in the special provisions, page 28 -31. Please clarify that a five year manufacturers warranty is required.

Page 31 of special provisions details initial retroreflectivity requirements, but does not state length of initial period. Measurement is required between 48 hours and 30 days after initial installation. Please clarify that this is the initial retroreflectivity period required.

Inquiry submitted 10/19/2017

Response #1:
Your inquiry has been received and is being reviewed. If a response is not posted before bid opening addressing your inquiry, please bid per the current contract documents.
Response posted 10/19/2017


Response #2:
Please bid per the current contract documents.
Response posted 10/20/2017


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.