Viewing inquiries for 01-0C8104

Submit new inquiry for this project


Inquiry #1: 1. Is the color for the colorized JPCP an integrally colored concrete or is it dry-shake on color? If it is dry-shake, what is the dosage rate?
2. Is the minor concrete island paving colorized?
3. Is the JPCP (Stamped) colorized?

Inquiry submitted 04/24/2018

Response #1:
(#1)-Your inquiry has been received and is being reviewed.
Response posted 04/24/2018


Response #2:
1. Integrally colored or dry-shake are both acceptable. Dosage rates would be per manufacture?s recommendations in order to achieve specified color.
2. Your attention is directed to project plan sheet LQ-1 and also to project Special Provisions Section 78-4.
3. Your attention is directed to project plan sheet LQ-1 and also to project Special Provisions Section 78-4.
Response posted 04/27/2018




Inquiry #2: Part of the work in Stage 1 is to lower the vertical profile of Highway 20 between the frontage road and the roundabout, including reconstruction of the structural section as shown on the drawings. This reconstruction also includes part of the SW4 bypass lane. Because of this, it seems the work in this area of Stage 1 should be phased to show how traffic is being shifted while the road is being reconstructed, since we have to have a lane open in each direction at the end of each work day. The current traffic handling plans do not show any phasing of the work.

1. Can Caltrans provide details of phasing the work between the frontage road and the roundabout in Stage 1?
2. Will interim temporary striping be required to carry out the phasing?
3. Will additional k-rail be necessary to protect the sections being reconstructed in each phase?
4. Can the SW4 bypass lane be closed while we are reconstructing W1 814+11 to 821+50? Traffic can be sent to the existing intersection of Highways 20 and 53.

Inquiry submitted 04/25/2018

Response #1:
(#2)-Your inquiry has been received and is being reviewed.
Response posted 04/25/2018


Response #2:
1- Your attention is directed to plan sheets TH-1 through TH-4, and TH-14. Alternate lowering the profile in the eastbound and westbound directions, not exceeding the maximum elevation difference of 0.15 foot between opposing traffic lanes. Elevation differences of greater than 0.15 foot would require Temporary Railing Type K between opposing lanes.
2- Your attention is directed to plan sheets TH-1 through TH-4, and TH-14. Traffic will be traveling on unpaved surface.
3- If required, Resident Engineer will request additional K-Rail and Crash Cushions to be installed.
4- Your attention is directed to Chart No. K1 in Standard Special Provisions for SW-4 closure (night time closure).
Response posted 04/27/2018




Inquiry #3: The section of highway to get 1' of lime treatment is within an area where there is one lane in each direction. Standard Spec Section 24-2.03A says that from the application of lime to 3 days after the application of curing treatment, only equipment and vehicles essential to the lime stabilization work are allowed on the lime stabilized soil. Reversible traffic control is only allowed for 9 hours at night per Chart K1. Is Caltrans going to allow traffic to run on the lime stabilized soil during all hours while the lime cures?
Inquiry submitted 04/27/2018

Response #1:(#3)-Your inquiry has been received and is being reviewed.
Response posted 04/30/2018


Response #2:
An addendum has been issued to address this bidder inquiry. Please refer to Addendum No. 2, issued on Wednesday, May 16, 2018.
Please bid per the current contract documents.
Response posted 05/16/2018




Inquiry #4: We are in receipt of Addendum #2 which contains significant changes to phase 1 staging. Due to the extent of these changes will Caltrans please consider postponing the bid date to allow contractors sufficient time to review the changes?
Inquiry submitted 05/16/2018

Response #1:
(#4)-Your inquiry has been received and is being reviewed.
Response posted 05/17/2018


Response #2:
Please bid per the current contract documents.
Response posted 05/17/2018


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.