El Dorado U.S. Highway 50 Hot Mix Asphalt Overlay Project


DESCRIPTION

This is a Highway Maintenance project located on U.S. Highway 50 in El Dorado County. Project limits begin from the west end of Sawmill Undercrossing (post mile 28.8) and end to the west of South Fork American River Bridge (post mile 38.8). The proposed project will overlay the existing roadway with 0.10' of rubberized hot mix asphalt. Local road approaches will be cold planed and repaved with hot mix asphalt.


PROJECT BENEFITS

Purpose: The purpose of the project is to preserve the drivability and serviceability of this section of Route 50.

Need: This portion of Highway 50 contains alligator cracking, rutting, delaminating and is degrading such that a Highway Maintenance program is needed to preserve the existing roadway.


FUNDING BREAKDOWN

The Project Approval and Environmental Document (PA&ED) work and the Design support components are being funded from the State Highway’s Major Maintenance Program. The Construction Support and Capital expenses are funded from the SB1 Program.

COST ESTIMATE:
Support Cost: $600,000
Capital Cost: $5,575,425
Total Project Cost: $6,175,425


PROJECT SCHEDULE

Project Approval & Environmental Document -- 5/1/2017
Design Completed -- 12/14/2017
Advertise Project -- 1/8/2018
Begin Construction -- 7/9/2018
Expected Completion -- 9/10/2018

PARTNERSHIP

none

PROJECT CONTACT

Sameh Hegazi, Project Manager
Phone: (530) 741-4319
Email: sameh.hegazi@dot.ca.gov

Steve Nelson, Public Information Officer
Phone: (530) 741-4566
Email: gilbert.mohtes-chan@dot.ca.gov

NO DOCUMENTS AVAILABLE

NO NEWS AVAILABLE

NO ADDITIONAL PHOTOS OR VIDEOS AVAILABLE


News

Contact Information

General Information:

Phone: (530) 741-4572
Fax: (530) 741-4111

Physical Address:

California Department of Transportation
District 3
703 B Street
Marysville, CA 95901