Sac-99 Bridge Seismic Retrofit Project


DESCRIPTION

Project is near Elk Grove and proposes to seismically retrofit five bridges: Dillard Road Overcrossing (OC) (Br No 24-0163 PM 7.36), Cosumnes River Overflow (Br No 24-0021R/L PM 7.92), and Cosumnes River (Br No 24-0020R/L PM 8.40). On Dillard Road OC replace non-standard bridge railing, remove asphalt concrete surfacing, place polyester concrete deck overlay, and replace westbound sidewalk. On the left bridges at Cosumnes River Ovfl and Cosumnes River shoulders widen shoulders to conform to adjacent roadway sections, replace concrete approach slabs, replace approach/transition railing, replace non-standard bridge rails, remove asphalt concrete surfacing, and place polyester concrete deck.

PROJECT BENEFITS

Improvements will decrease structure deterioration and increase life span of the bridges, reduce future maintenance costs and efforts, and improve bridge performance during a seismic event.

FUNDING BREAKDOWN

Local - n/a
State - $19,353,000 SHOPP 112 Program
Federal - n/a
Estimated Total Project Cost - $19,353,000

PROJECT SCHEDULE

Environmental Document Completed -- June 2014
Right of Way Acquisition Completed --February 2016
Design Completed -- February 2016
Advertise -- April 2016
Begin Construction -- August 2016
Expected Completion -- December 2017

PARTNERSHIP

none

PROJECT CONTACT

Doug Lange, Project Manager
Phone: (530) 741-4465
Email: doug.lange@dot.ca.gov

Dennis Keaton, Public Information Officer
Phone: (530) 741-5474
Email: dennis.keaton@dot.ca.gov

NO ADDITIONAL DOCUMENTS AVAILABLE

NO NEWS AVAILABLE

NO ADDITIONAL PHOTOS OR VIDEOS AVAILABLE


News

Contact Information

General Information:

Phone: (530) 741-4572
Fax: (530) 741-4111

Physical Address:

California Department of Transportation
District 3
703 B Street
Marysville, CA 95901

Caltrans Logo

Translate.