State Route 99/Fulkerth Road Interchange Project


Temporary Logo

DESCRIPTION

The project will widen Fulkerth Road to accommodate six to seven lanes, with five-foot wide shoulders and six-foot wide sidewalks; Widen the northbound (NB) off-ramp to provide two lanes where it connects to Fulkerth; Reconstruct the NB on-ramp to provide two mixed-flow lanes and one future high occupancy vehicle (HOV) preferential lane with provisions for future ramp metering; Realign the southbound (SB) off-ramp to improve intersection spacing and provide three lanes where it connects to Fulkerth; Realign the SB on-ramp to improve intersection spacing, and provide two mixed- flow lanes and one future HOV preferential lane with provisions for future ramp metering; Align Dianne Drive with existing Auto Mall Drive, eliminating the offset local street intersection on Fulkerth Road; Signalize the Dianne Drive/Fulkerth Road, State Route 99 (SR-99) SB ramps/Fulkerth Road and SR-99 NB ramps/Fulkerth Road intersections. This project includes $5.5 million from the Local Partnership Program, part of Senate Bill 1.


PROJECT BENEFITS

The city of Turlock has experienced growth and development, primarily along the SR-99 corridor. This project will provide a more efficient interchange at SR-99 and Fulkerth Road, while also improving surface streets adjacent to the interchange. The on-ramps also will be made ready for future ramp metering. This project also positively responds to the city’s Northwest Triangle Specific Plan and the Westside Industrial Specific Plan.


FUNDING BREAKDOWN

The estimated construction cost for the SR-99/Fulkerth Interchange Project is $12 million. SB 1 funding will account for $5.5 million, and the remaining $6.5 million will be funded from local sources. Any costs over $12 million will also be funded by local sources.


PROJECT SCHEDULE

Construction is scheduled to start in October 2018 and the project is scheduled to be completed December 2019.


PARTNERSHIP

Caltrans is partnering with the City of Turlock and Stanislaus County on this project.


PROJECT CONTACT

District 10 Public Information Office
Rick Estrada, Public Information Officer
1976 Dr. Martin Luther King Jr. Boulevard
Stockton, CA 95205
Phone: (209) 948-7977
E-mail: district10publicaffairs@dot.ca.gov

Sam Sherman, Project Manager
Caltrans
Phone: (209) 948-7889
E-mail: Sam.Sherman@dot.ca.gov

Nathan Bray, City Engineer
City of Turlock
Phone: (209) 668-2096
E-mail: NBray@turlock.ca.us

2D Illustration of Fulkerth Road Interchange
2D Illustration

3D Illustration of Fulkerth Road Interchange
3D Illustration

SR-99/Fulkerth Road Interchange Project Groundbreaking
Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking

Groundbreaking



District 10 Twitter Feed

Contact Information

General Information:

Phone: (209) 948-7543
Public Information Office:
(209) 948-7977
Fax: (209) 948-3895
Email: District 10 PIO

Physical Address:

California Department of Transportation
District 10
1976 East Dr. Martin Luther King Jr. Blvd.
Stockton, CA 95205

Connect With Us

Caltrans Logo

Translate